My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
2510
>
2300 - Underground Storage Tank Program
>
PR0547192
>
INSTALL_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:30 PM
Creation date
11/9/2021 8:52:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2021
RECORD_ID
PR0547192
PE
2351
FACILITY_ID
FA0026782
FACILITY_NAME
ARCO AM/PM - BP FUEL DISPENSING FACILITY
STREET_NUMBER
2510
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95205
APN
17130024
CURRENT_STATUS
03
SITE_LOCATION
2510 S HWY 99
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TYPICAL INSTALLATION <br /> ' VERY IMPORTANT ' <br /> To allow for drainage, Fibrelite recommends that the concrete be sloped away from the top <br /> outer edge of the frame (A) a minimum of 112" over a 12" distance. Do not expose the top outer <br /> . edge of the frame (A) — the concrete pad must be flush with the top outer edge of the frame. <br /> CONCRETE <br /> VERY IMPORTANT <br /> FRAMES MUST BE INSTALLED FLUSH <br /> WITH FINISHED GRADE OR SET SLIGHTLY <br /> BELOW FINISHED GRADE TO PROTECT VERY IMPORTANT <br /> FROM SNOWPLOW DAMAGE The underside of the frame <br /> "A• must be adequately <br /> supported by concrete. <br /> 1y' 12" 20" <br /> Minimum 4 : I • �7 . { " � � cl I /. <br /> S" 14 ii41j14 <br /> Maximum <br /> 1411 et 4 - 1 -' <br /> 4 4 . � � � � \ <br /> ,� 4' �• 4. <br /> ° g 00 <br /> 8a <br /> 00 a sae ° go <br /> OJoint tied with <br /> 24" long x <br /> a °e °0 00 ° g e° 12mm dowel at <br /> 24" cl <br /> Half bonded <br /> ° s , <br /> ° ao ° ee <br /> Concrete reinforced <br /> with 2 layers of <br /> 00 a ago0. egodo <br /> Go 0' s reinforcement mesh. <br /> ° a°,00 <br /> 00 0 " a0 Go 90 e 0so <br /> 0 a go 0 00 add Oft <br /> °0 <br /> ao <br /> ° <br /> ado geadg% <br /> IF <br /> 4.4 CONCRETE <br /> PEA GRAVEL <br /> Flbrel mulliport kit includes watertight platform for (2) 5-gallon spill buckets, 40' Forrelerence purpose• only. Th'• arevanpi• n To <br /> diameter multipart cover, port rovers, frame and skirt. @eelfieasen. Order against proaud saes only. m FIBRELITE " <br /> enable eentlnuoder agaovemenl of °urpreauda, Ibe <br /> dravn• and •pecifiutlane ere •ubleclta cbenpe <br /> 411110 <br /> vilbuut nodes. <br /> r> "r or oew <br /> Issue: 04/03/2020 Page: 4 of 4 0 Copyright <br />
The URL can be used to link to this page
Your browser does not support the video tag.