Laserfiche WebLink
EWWONMEIVTAL <br /> TECHIVOLOCIES <br /> Task IV: Implementation of Attenuation and Leaching Studies <br /> Deliverable: Experimental studies and chemical results of leaching and attenuation studies <br /> Following discussions with regulatory agencies, the experiments designed in Task H will be <br /> revised as necessary and implemented. Moju E.T. will retain Clayton Environmental <br /> Laboratories as subcontractors to conduct the site-specific leaching studies for CAM metals, <br /> solvent organics, PNAs, phenols,petroleum hydrocarbons, and any chemical constituent selected <br /> in Task Il, as well as the measurement of critical parameters such as organic matter, clay <br /> content, grain-size distribution and oxide composition of site soil, and permeability of waste. <br /> Moju E.T. will design and set up necessary experiments studies in Clayton's laboratory. <br /> Chemical analysis of effluents will also be conducted by the subcontrator laboratory. <br /> Task V: Preparation of Designated Levels Report <br /> Deliverable: Site-specific designated levels report and regulatory approval of report. <br /> Moju E.T. will prepare a report summarizing all the designated levels for each chemical <br /> identified in Tasks I through IV. The report will contain the designated levels for chemicals <br /> estimated using: 1) the generic values of attenuation and leachability factors; 2) the critical <br /> parameters used to determine site-specific attenuation and leachability factors; 3) the empirical <br /> models for predicting site-specific attenuation or leachability factors; and 4) experimental <br /> verification of the factors for those chemicals with site-specific designated levels. Tables <br /> summarizing designated levels for the landfill will be included in the report. <br /> SCHEDULE <br /> The overall duration of the Tasks I through V is projected at 12 to 16 weeks. Task I will <br /> commence within a week following Forward's approval of this Work Plan and will be conducted <br /> over a period of two weeks. Task II will be conducted following the completion of Task I, over <br /> a period of three to four weeks. Task III should occur during the sixth or seventh week of the <br /> project. Two to four weeks will be used to set up attenuation and leaching studies and another <br /> three to four weeks will be required to obtain the analytical results described in Task IV. Task <br /> V will commence concurrently with Task IV and be completed about two weeks following the <br /> completion of Task IV. <br /> August 15, 1990 5 Revision 2.0 <br /> 7255 Saroni Drive-Oakland,California,USA 94611 <br /> TEL(415)339-1543-FAX(415)339-6775 <br />