Laserfiche WebLink
Project Name:Nonresidential Building NRCC-PRF-01-E Page 7 of 16 <br />Project Address:610 West Kettleman Lane Lodi 95240 Calculation Date/Time:14:44, Wed, Feb 17, 2021 <br />Input File Name:2020-121 Takeoff.cibd19x <br />CA Building Energy Efficiency Standards- 2019 Nonresidential Compliance Report Version: NRCC-PRF-01-E-11022020-6384 Report Generated at: 2021-02-17 14:45:26 <br />H4. Wet System Equipment(boilers,chillers,cooling towers,etc.) <br />This Section Does Not Apply <br />H5. SYSTEM SPECIAL FEATURES <br />1 2 3 4 5 6 <br />System Name Optimum Start Window Interlocks per <br />§140.4(n)Evaporative Cooling Heat Recovery Other Controls <br />HPFC-1 No Optimum Start NA No Evaporative Cooler No Heat Recovery <br />No DCV Controls, No DDC <br />No Economizer <br />No Supply Air Temp. Control <br />HPFC-2 No Optimum Start NA No Evaporative Cooler No Heat Recovery <br />No DCV Controls, No DDC <br />No Economizer <br />No Supply Air Temp. Control <br />Notes: This table includes controls related to the performance path only. For projects using the prescriptive path, mandatory and prescriptive controls requirements are documented on the NRCC-MCH-E. <br />H6. MECHANICAL VENTILATION <br />1 2 3 4 5 6 7 8 9 <br />Zone Name <br />Mechanical Ventilation DCV or Occupant <br />Sensor Controls, <br />or BothVentilation Function # hotel rooms # of people # of <br />bedrooms Supply OA CFM Exhaust CFM Conditioned <br />Area (sf) <br />8-Offices Office - Office space 0 1.48 0 44 0 295 NA <br />10-IT Room Misc - Computer (not <br />printing)0 0.19 0 19 0 125 NA <br />Multifamily or Hotel/Motel Occupancy? (if “Yes”, see DOMESTIC/SERVICE HOT WATER SYSTEM SUMMARY )No <br />Does the Project include Zonal Systems?No <br />