Laserfiche WebLink
PLUMBING LEGEND ABBREVIATIONS PLUMBING GENERAL NOTES <br /> LINETYPES AFF ABOVE FINISHED FLOOR 1. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES AND GOVERNING AUTHORITIES. LE <br /> BLDG BUILDING CALIFORNIA BUILDING CODE 2019-PLUMBING. <br /> SANATARY PIPING CW COLD WATER V) <br /> z CWV COMBINATION WASTE&VENT 2. ALL SYSTEMS ARE SHOWN SCHEMATICALLY.THE DRAWINGS ARE GENERALLY DIAGRAMMATIC AND U O N r- <br /> CD \ -------------------------------- DBL DOUBLE INDICATIVE OF THE WORK TO BE PERFORMED.THE DRAWINGS ARE NOT INTENDED TO SHOW EXACT N m <br /> VENT PIPING a 0 <br /> v DIA DIAMETER LOCATIONS OR TO SHOW EVERY PIPE,FITTING,VALVE,OR APPURTENANCE REQUIRED FOR A �; V <br /> "' w DN DOWN COMPLETE INSTALLATION. '� � � <br /> COLD WATER PIPING —- - - - -— EA EACH C 7b V <br /> EQUIP EQUIPMENT 3. DO NOT SCALE LOCATION DIMENSIONS FROM THESE DRAWINGS. V) <br /> EXIST EXISTING o N N <br /> e(E) FS SYMBOLS \_� <br /> (C (E)3"CWV FCO FLOOR CLEAN OUT 4. CHECK AND VERIFY ALL CONDITIONS AT THE SITE WITHIN CONTRACT LIMITS <br /> \� e SHUT-OFF VALVE FS FLOOR SINK <br /> (E) FS GC GENERAL CONTRACTOR 5. IT IS INTENDED THAT THE DRAWINGS AND SPECIFICATIONS SHALL PROVIDE A WORKING INSTALLATION <br /> GEN GENERAL COMPLETE IN EVERY DETAIL AND ALL ITEMS NECESSARY FOR A COMPLETE INSTALLATION SHALL BE <br /> ,O POC e CHECK VALVE N GR GREASE RAIN LINE FURNISHED. <br /> MAX MAXIMUM <br /> 0 <br /> % CAPPED END ] MFR MANUFACTURER 6. THE OMISSION OF EXPRESSED REFERENCE IN THE DRAWINGS OR SPECIFICATION TO ANY LABOR OR <br /> MIN MINIMUM MATERIAL NECESSARY FOR THE PROPER EXECUTION OF THE WORK IN ACCORDANCE WITH PRESENT <br /> ' (N)3"CWV POC POINT OF CONNECTION GOOD PRACTICE OF THE TRADE SHALL NOT RELIEVE THIS CONTRACTOR FROM PROVIDING SUCH <br /> FLOOR CLEANOUT e SAN SANITARY DRAIN LINE ADDITIONAL LABOR AND MATERIAL UNDER THIS CONTRACT. <br /> SS STAINLESS STEEL <br /> \ `�✓ FS-1 PIPE DROP AND RISE D 6 V VENT 7. ALL INSTALLATION AND WORK SHALL BE PERFORMED IN A NEAT,WORKMANLIKE MANNER SO AS NOT <br /> VOL VOLUME TO DAMAGE ANY SURFACES,EQUIPMENT OR MATERIALS. <br /> \ PIPE UP AND DOWN � -0- VTR VENT THROUGH ROOF <br /> \ (E)3"VTR W/ WITH 8. ALL EQUIPMENT AND MATERIALS INCORPORATED IN THIS WORK SHALL BE NEW UNLESS NOTED 1 <br /> OTHERWISE AND SHALL BE CURRENT PRODUCTS BY MANUFACTURERS REGULARLY ENGAGED IN THE <br /> > (- 3"V POINT OF CONNECTION e NOTE: PRODUCTION OF SUCH PRODUCTS. <br /> THE ABOVE SCHEDULE IS STANDARD.ALL ABBREVIATIONS 9. MANUFACTURERS AND MODEL NUMBERS REFERENCED ON THESE DRAWINGS ARE FOR REFERENCE C� <br /> X DETAIL # LISTED DO NOT NECESSARILY APPEAR ON THESE DRAWINGS. <br /> w DETAIL IDENTIFIER ONLY AND TO ESTABLISH A BASIS OF DESIGN.PRODUCTS PROVIDED BY ALTERNATE MANUFACTURERS <br /> P000 DRAWING NUMBER SHALL BE CONSIDERED PROVIDING THEY MEET THE QUALITY STANDARDS REFERENCED HEREIN. <br /> J \�9 10. INSTALL ALL EQUIPMENT AND MATERIALS IN STRICT ACCORDANCE WITH RESPECTIVE <br /> c MANUFACTURER'S WRITTEN INSTRUCTIONS.MAINTAIN CLEARANCES FOR ACCESS TO SERVICE p <br /> \� \ (E) FS PIPING MATERIAL SCHEDULE EQUIPMENT,VALVES AND CONTROLS. 45 z5o <br /> (E CO (E)3"VTR \ \ (E)3"CWV COORDINATE PLUMBING WORK WITH THE WORK OF ALL OTHER TRADES. �INSULATION <br /> (E) FCO \ (E) S \ J SERVICE SIZE MATERIAL SCHEDULE/TYPE REMARKS ALL DIMENSIONS AND PIPE SIZES ARE IN INCHES,UNLESS NOTED OTHERWISE. 0 0 <br /> ❑ \ \ TYPE THICKNESS o O N <br /> (E) FS \�tj SANITARY ALL PVC SCH.40 NONE FURNISH AND INSTALL ACCESS PANELS WHERE REQUIRED FOR ACCESS TO ALL CONCEALED VALVES <br /> O \\o \ \ \ FOR EQUIPMENT WHERE NO OTHER MEANS IS PROVIDED. J 000 <br /> ��\s�C \ RUN CONCEALED PIPING ON ROOM SIDE OF THE BUILDING INSULATION,UNLESS NOTED OTHERWISE. 3 <br /> ,J � rn <br /> > ?L\ \ PLUMBING DRAINAGE SCHEDULE CONSTRUCTION MATERIALS AND EQUIPMENT REMOVED SHALL BECOME THE PROPERTY OF THE _ ) Q J <br /> CONTRACTOR AND SHALL BE LEGALLY DISPOSED OF OFF THE SITE UNLESS NOTED OTHERWISE. o Q p U <br /> w \ MANUFACTURER/ OUTLET STRAINER/GRATE DATA - 10� z <br /> \ SYMBOL DRAIN TYPE MODEL# SIZE 16. COORDINATE WORK WITH STRUCTURAL AND ARCHITECTURAL FEATURES AND PROVIDE OFFSETS AND z O <br /> SIZE MATERIAL TYPE REMARKS FITTINGS AS REQUIRED. W <br /> O \ (E) FCO 2i Q 06 <br /> STAINLESS WITH TRAP GUARD,ACID 17. PATCH ALL OPENINGS IN BUILDING CONSTRUCTION WHERE PIPING,FIXTURES,ETC.ARE REMOVED. Q <br /> FS-1 FLOOR SINK ZURN#Z-1902 3" 12"x12" HALF U) U) <br /> STEEL RESISTING COATING PATCHING SHALL BE THE SAME MATERIALS AS THE SURROUNDING CONSTRUCTION. FINISH TO MATCHa Q oo Q W <br /> 1 PARTIAL FLOOR PLAN - DRAINAGE NEW WORK EXISTING TOT HE GREATEST EXTENT POSSIBLE. w �^ Q <br /> 18. SEAL ALL PENETRATIONS OF FIRE AND SMOKE RATED PARTITIONS IN ACCORDANCE WITH ALL L U V J z <br /> PLUMBING SCOPE OF WORK APPLICABLE CODES WITH A UL LISTED SYSTEM. Q <br /> SCALE: 1/4"=1'-0" - <br /> DRAINAGE PIPING DRAWING KEYNOTES ® 19. SEAL ALL PENETRATIONS THROUGH EXTERIOR WALLS, FLOORS AND ROOFS WATERTIGHT. <br /> SANITARY: - <br /> 1. REFRIGERATED END:PROVIDE 1 1/2"PVC DRAIN PIPE INDIRECT TO NEW FLOOR SINK. PROVIDE NEW FLOOR SINK AND UNDER-SLAB SANITARY.CONNECT TO EXISTING SANITARY PIPING AS SHOWN. 20. ALL EQUIPMENT AND PIPING ABOVE CEILING SHALL BE SUPPORTED IN AN APPROVED MANNER FROM MM ' <br /> THE BUILDING STRUCTURE AND INCLUDE HANGERS AND RESTRAINTS IN ACCORDANCE WITH ALL W <br /> 2. FLOOR SINK-1:PROVIDE ZURN Z1902 12X12X10 DEEP,CAST IRON BODY WITH WHITE ACID RESISTING PROVIDE INDIRECT SANITARY PIPING FROM ISLAND DRAIN POINTS TO FLOOR SINK. Ljj <br /> APPLICABLE CODES AND SEISMIC RESTRAINT REQUIREMENTS. W z <br /> PORCELAIN ENAMEL INTERIOR AND HALF GRATE TOP,ALUMINUM ANTI-SPLASH DOME STRAINER. Z <br /> 21. WHERE EQUIPMENT,PIPING,FIXTURES,ETC.TO REMAIN IS SUPPORTED FROM EQUIPMENT AND/OR Q <br /> PIPING BEING REMOVED,EXTEND EXISTING HANGERS OR PROVIDE NEW HANGERS AND SUPPORTS AS z <br /> REQUIRED TO RE-SUPPORT ITEMS FROM THE BUILDING STRUCTURES. Q J <br /> 22. EXISTING EQUIPMENT AND MATERIALS SHALL REMAIN,UNLESS NOTED OTHERWISE. E >_ W <br /> s 0 <br /> 23. MINIMUM SIZE OF BELOW GRADE SANITARY AND WASTE PIPING SHALL BE 2". _ W0 <br /> 0 <br /> 24. CONNECT WATER,WASTE AND VENT PIPING TO FIXTURES IN ACCORDANCE WITH SIZE INDICATED ON - 0 Y Lo J <br /> THE FIXTURE SCHEDULE. a W J ~ <br /> Q J WWQ WJ <br /> 25. RUNOUTS TO EQUIPMENT SHALL BE SIZED AS INDICATED AND INCREASED OR REDUCED AT THE POINT � 3: U <br /> OF FINAL CONNECTION TO THE EQUIPMENT. r LOU Q 0-) p ~ <br /> � � � It0 W � <br /> 26. PROVIDE ESCUTCHEONS AT ALL EXPOSED PIPE PENETRATIONS OF FLOORS,WALLS,AND CEILINGS. m N J = <br /> cn <br /> E <br /> 27. ALL SYSTEMS SHALL BE TESTED FOR PROPER OPERATION IN ACCORDANCE WITH APPLICABLE CODES <br /> OR REGULATIONS. y QRpFESS/pN <br /> �� RflIAz. q <br /> 28. INSTALL ALL WORK IN ACCORDANCE WITH ALL APPLICABLE CODES AND REGULATIONS. <br /> 29. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS AS REQUIRED TO <br /> COMPLETE THE INSTALLATION AS INDICATED ON THESE DRAWINGS. w m ren <br /> NO. M 3 <br /> 30. PROVIDE OWNER WITH CERTIFICATES OF FINAL INSPECTIONS AND ACCEPTANCE FROM THE 1 1/2021 <br /> AUTHORITY HAVING JURISDICTION. V <br /> 31. CONTRACTOR SHALL VERIFY LOCATION OF EXISTING UNDERGROUND UTILITIES AND PIPING BEFORE <br /> COMMENCING WORK AND WILL BE FULLY RESPONSIBLE FOR ALL DAMAGES WHICH MIGHT OCCUR BY C{� <br /> THE FAILURE TO EXACTLY LOCATE AND PRESERVE ANY UNDERGROUND UTILITIES. 10/13/2021 <br /> z <br /> y W N <br /> d <br /> O <br /> � Q N <br /> D � <br /> 0 <br /> O <br /> d � <br /> o <br /> Z <br /> °R <br /> � � W � <br /> 0 0 ®® 0 Q a <br /> 0 0 Ltryryryryryryryry <br /> �� 4A4A��L�''L..u.-�'LIL�LIL�LIL��L�L�❑ E� -`°o J Q' <br /> a W O <br /> ® D - o' LL <br /> r-, °� Lu <br /> Doo ' .Do i d D <br /> U) <br /> m U) <br /> m <br /> o <br /> o_ <br /> O ° 0 <br /> ELE <br /> DRAIN FROM r <br /> FLOOR SINK FIXTURE ❑ z C%4 <br /> 0 <br /> CD <br /> FLOOR SINK TO BE ® A o <br /> RAISED 2 INCHES `-- o w <br /> O W N Z Y <br /> it E O N_ Q W <br /> ABOVE FLOOR AND �--� <br /> GROUTED LEVEL. ® d `� <br /> 2" 6,. D D U <br /> AREA OF WORK <br /> 4 <br /> v ° <br /> ® 0 LODI, CA <br /> o <br /> 3"WASTE PIPE ---- ooao ® 00 <br /> SAFEWAYCI <br /> (MINIMUM) qo <br /> o o o o <br /> ® oo _ ® gym❑ <br /> O o <br /> gi <br /> 2 FLOOR SINK DETAIL o o a ®Ep a <br /> P1 SCALE:NTS KEY PLAN <br />