Laserfiche WebLink
TABLE 3 <br />PRECIPT`%AND �'�`P� �T,T1Cf� ' <br />MONTH/YEAR <br />TOTAL PRECIPITATION (in) <br />TOTAL Eto (in) <br />POTENTIAL DEEP <br />PERCOLATION (in) <br />Feb 2014 <br />2.67 <br />1.91 <br />0.76 + 4.87 = 5.63 <br />Dec 2014 <br />5.83 <br />0.96 <br />Nov 2015 <br />1.95 <br />1.89 <br />0.06 + 0.90 = 0.96 <br />Dec 2015 <br />2.14 <br />1.24 <br />Jan 2016 <br />4.38 <br />1.11 <br />3.27 + 0.85 = 4.12 <br />Dec 2016 <br />2.07 <br />1.22 <br />Jan 2017 <br />5.50 <br />1.09 <br />4.41 <br />AVERAGE <br />5.63+0.96+4.12+4.41=15.12=4= 3.78 <br />3.78 <br />III. NITRATE LOADING STUDY FINDINGS <br />A. WASTEWATER CHARACTERISTICS AND FLOW VOLUME PROJECTIONS <br />WASTEWATER CHARACTERISTICS <br />The wastewater characteristics are anticipated to be those normally found in typical domestic or household <br />systems. The scientific literature cites domestic wastewater nitrogen concentrations to be anywhere from 35 <br />mg/L to 45 mg/L N, and up to 62 mg/L. An average concentration of 45 mg/L will be used in the <br />calculations below and will be adjusted based on scientific data and the recommendation of installing a <br />2,000 gallon septic tank instead of the required 1,200 gallon tank for the three bedroom modular home. <br />WASTEWATER FLOW VOLUME PROJECTIONS <br />To determine nitrate -nitrogen loading from any project, wastewater flow volumes must be determined as <br />accurately as possible. Domestic flow volume projections are typically approximated from the USEPA <br />Onsite Wastewater Treatment Systems Manual, Pg. 3-4. However, for nitrate loading calculations, the EHD <br />currently requires wastewater flow volume projections from single family residential structures to be <br />calculated as follows: 100 gallons per day (gpd) for the first bedroom and 50 gpd for all subsequent <br />bedrooms within the structure. Therefore, the projected flow volumes for this project are: <br />2 Bedroom existing single family residential structure: 100 + 50 = 150 gpd. <br />3 Bedroom existing mobile home structure: 100 + 50 + 50 = 200 gpd. <br />3 Bedroom proposed modular home structure: 100 + 50 + 50 = 200 gpd. <br />Total Wastewater Flow Volume: 150 + 200 + 200 = 550 gpd. <br />5 <br />Chesney Consulting <br />