My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014517
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
3548
>
2600 - Land Use Program
>
PA-2100263
>
SU0014517
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 10:36:56 AM
Creation date
12/6/2021 2:56:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014517
PE
2690
FACILITY_NAME
PA-2100263
STREET_NUMBER
3548
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
APN
12103047, -48, -49, -50, -51
ENTERED_DATE
11/16/2021 12:00:00 AM
SITE_LOCATION
3548 W COUNTRY CLUB BLVD
RECEIVED_DATE
12/1/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br />Electric Company <br />11. Cathodic Protection: PG&E pipelines are protected from corrosion with an "Impressed <br />Current" cathodic protection system. Any proposed facilities such as metal conduit, pipes, <br />service lines, ground rods, anodes, wires, etc, that might affect the pipeline cathodic protection <br />system must be reviewed and approved by PG&E Corrosion Engineering. <br />12. Pipeline Marker Signs: PG&E needs to maintain pipeline marker signs for gas <br />transmission pipelines in order to ensure public awareness of the presence of the pipelines. <br />With prior written approval from PG&E Pipeline Services, an existing PG&E pipeline marker sign <br />that is in direct conflict with proposed developments may be temporarily relocated to <br />accommodate construction work. The pipeline marker must be moved back once construction is <br />complete. <br />13. PG&E is also the provider of distribution facilities throughout many of the areas within <br />the state of California. Therefore, any plans that impact PG&E's facilities must be reviewed and <br />approved by PG&E to ensure that no impact occurs which may endanger the safe operation of <br />its facilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.