Laserfiche WebLink
CALGREEN 2019 COMPLIANCE SCHEDULE - MANDATORY MEASURES Verification <br /> Verification Section Requirement Project-Specific Information Responsibility Documentation <br /> Section Requirement Project-Specific Information Responsibility Documentation <br /> J5.410.4 Testing and adjusting of systems for buildings less than Refer to applicable specifications and notes on [determine Final Testing Report ri <br /> 10,000 s.f.: mechanical plans. testing agent <br /> 5.1 PLANNING + DESIGN 1. Develop a written plan of procedures for testing and or team] <br /> adjusting HVAC systems and controls, indoor and <br /> J 5.106.1 Stormwater pollution prevention—For project sites ref. local ordinance Jurisdiction BMP outdoor lighting and controls,water heating systems, <br /> disturbing less than one acre of land, comply with local renewable energy systems, landscape irrigation q i <br /> ordinances for stormwater management and/or erosion systems, and water reuse systems, if any. �/�/ In n I <br /> control; and/or implement BMPs for erosion/sediment control. 2. Perform testing, adjusting and balancing proceduresin accordance with project specifications ARCHITECTS <br /> 5.106.4.1.1 Short-term bicycle parking—For projects adding ten or N/A Jurisdiction No additional 3. Provide final report of testing signed by the individual <br /> more visitor vehicle parking spaces, provide permanently- documentation required responsible for performing the tests <br /> anchored, readily-visible bicycle racks within 200' of visitors' 4. Provide building owner with operation and <br /> entrance, equal to 5%of new visitor vehicle capacity(min 2). maintenance manual. <br /> 5.106.4.1.2 Long-term bicycle parking—For projects adding vehicular N/A- Project adds no tenant spaces. Jurisdiction No additional 5757 Pacific Avenue <br /> parking for 10 or more tenant-occupants, provide secure documentation required Suite 226 <br /> bicycle parking equal to 5% of the tenant-occupant vehicular 5.5 ENVIRONMENTAL QUALITY Stockton, CA 95207 <br /> parking spaces(min. one bicycle parking facility). <br /> 5.106.5.2 Designated parking for clean air vehicles— In projects N/A Jurisdiction No additional 5.503.1 Fireplaces— Install only direct-vent sealed-combustion gas or N/A- Project contains no fireplaces. Contractor/ Product data and installation <br /> adding 10 or more vehicular parking spaces, provide documentation required sealed wood-burning fireplaces, or a sealed wood stove or Installer instructions for installed 2000 L Street <br /> designated parking for any combination of low-emitting,fuel- pellet stove. Wood stoves and pellet stoves shall comply with fireplace,wood stove or Suite 125 <br /> efficient and carpool/vanpool vehicles per Table 5.106.5.2 U.S. EPA NSPS emission limits. pellet stove Sacramento, CA 95811 <br /> 5.106.5.3 Designated parking for charging of electrical vehicles— N/A Jurisdiction No additional ✓ 5.504.1.3 Limit use of permanent HVAC system during construction Refer to notes on mechanical plans. Contractor/ No additional <br /> At projects containing ten or more vehicle parking spaces, documentation required to condition the building within the required temperature range Installer documentation required T 209.944.9110 <br /> install raceways for future electric vehicle supply for material and equipment installation. If the HVAC system is <br /> equipment—quantity per Table 5.106.5.3.3. used during construction, use return air filters with a Minimum F 209.944.5711 <br /> 5.106.8 Light pollution reduction—Design and install outdoor N/A Jurisdiction Product data for installed Efficiency Reporting Value(MERV)of 8, or an average www.wmbarchitects.com <br /> lighting systems to comply with the following: light fixtures demonstrating efficiency of 30%; and replace all filters prior to occupancy. <br /> - Min. requirements for Lighting Zones 0-4 per CEC compliance with listed ✓ 5.504.3 Covering of duct openings and protection of mechanical Refer to notes on mechanical plans. Contractor/ No additional <br /> - Backlight ratings per IES TM-15-11 standards and design equipment during construction—All duct and air Installer documentation required <br /> - Uplight and Glare ratings per CEC specifications distribution component openings shall be covered with tape, Jurisdiction <br /> -Allowable BUG (backlight, uplight, glare) ratings per Table plastic, and/or sheet metal during storage and rough <br /> 5.106.8 installation until final startup in order to reduce the amount of <br /> OR comply with local ordinance,whichever is more stringent. dust and debris which may collect in the system. <br /> 5.106.10 Grading and paving—Indicate how site grading or a N/A Jurisdiction/ No additional <br /> drainage system will manage all surface water flows to Civil Engineer documentation required 5.504.4.1 Adhesives, sealants and caulks shall comply with V.O.C. Refer to Interior Finish Schedule and Contractor/ Product data for <br /> keep water from entering buildings. limits listed in Tables 5.504.4.1 + 5.504.2 Specification Section 079200 Installer installed materials <br /> 5.504.4.3 Paints and coatings shall comply with V.O.C. limits listed in Refer to Interior Finish Schedule and Contractor/ Product data for <br /> 5.3 WATER EFFICIENCY + CONSERVATION Table 5.504.4.3 Specification Section 099100 Installer installed materials <br /> 5.303.1.1 Water meters—In new buildings or additions in excess of N/A Jurisdiction No additional ✓ 5.504.4.4 Carpet systems(including carpet cushion)shall meet the Refer to Interior Finish Schedule and Contractor/ Product data for <br /> 50,000 s.f., provide separate water meters or submeters for: documentation required testing and product requirements of Carpet and Rug Specification Section 096816 and/or 096813 Installer installed materials <br /> 1. Each individual tenant space projected to consume Institute's Green Label Plus Program. <br /> more than 100 gal/day <br /> 2. Where submeters for individuals tenants is not feasible, J 5.504.4.5 Composite wood products—Hardwood plywood, Refer to Interior Finish Schedule and Contractor/ Product data and/or Gospel Center Rescue <br /> add submeters to the following systems: particleboard, and medium density fiberboard shall comply Specification Sections 062000+ 064100 Installer certifications; <br /> a. Makeup water for cooling towers with formaldehyde emission limits specified in Table 5.504.4.5. chain of custody Mission Kitchen <br /> (where flow through >500 gpm) certifications Remodel <br /> b. Makeup water for evaporative coolers / 5.504.4.6 Resilient flooring—For 80%of the floor area receiving Refer to Interior Finish Schedule and Contractor/ Product data for <br /> (where flow through >6 gpm) V boilers 229 E. CHURCH STREET <br /> c. Steam and hot-water boilresilient flooring, install products complying with the 2014 CA- Specification Sections 096513, 096516, Installer installed materials <br /> (where energy input> 50ers Btu/h) CHPS criteria and listed in the CHPS High Performance 096519, and 096566. STOCKTON, CA 95203 <br /> Product Database or certified under the Resilient Floor <br /> 5.303.1.2 Water meters—Provide a separate submeter or metering N/A- No tenant projected to consume more than Jurisdiction No additional Covering Institute's FloorScore program. Provide verification <br /> device for any tenant within a new building or addition that 1,000 gal/day documentation required of compliance documentation. <br /> is projected to consumer more than 1,000 gal/day J <br /> 5.504.5.3 Air filters—Install air filtration media with a minimum MERV Refer to notes on mechanical plans. Contractor/ Product data and location <br /> 5.303.3.1 Water closet effective flush volume shall not exceed N/A Contractor/ rating of 13 for outside and return air. Installer of installed filters <br /> 1.28 gallons per flush. Installer _ <br /> 5.303.3.2 Urinal flush volume shall not exceed: N/A- Project contains no urinals. Contractor/ 5.504.7 Environmental Tobacco Smoke control—At designated N/A- No designated outdoor smoking area Jurisdiction No additional <br /> -0.125 gal/flush at wall-mounted urinals Installer outdoor smoking areas, post signage prohibiting smoking provided. documentation required CODE COMPLIANCE / <br /> -0.5 gal/flush at floor-mounted or other urinals within 25'of building entries, outdoor air intakes, and operable CALGREEN <br /> windows; or comply with local or applicable ordinance. <br /> 5.303.3.3.1 Showerheads shall have a maximum flow rate of 1.8 N/A- Project contains no showers. Contractor/ <br /> gal/min at 80 psi. Showerheads shall be certified to the Installer ✓ 5.505.1 Indoor moisture control—Buildings shall meet or exceed Refer to notes on mechanical plans. Jurisdiction No additional <br /> performance criteria of the U.S. EPA Watersense provisions of California Building Code, CCR, Title 24, Part 2, documentation required <br /> Specification for Showerheads. Section 1202, and Chapter 14. <br /> 5.303.3.3.2 Multiple showerheads serving one shower shall N/A- Project contains no showers. Contractor/ No additional ✓ 5.506.1 Outside air delivery for mechanically or naturally ventilated Refer to notes on mechanical plans. Jurisdiction No additional <br /> have a combined maximum flow rate of 1.8 gal/min Installer documentation required spaces in buildings—Meet the minimum requirements of documentation required <br /> at 80 psi. Or, the shower shall be designed to allow Section 120.1 (Requirements For Ventilation)of the <br /> only one showerhead to be in operation at a time. California Energy Code, or applicable local code,whichever <br /> is more stringent, and Division 1, Chapter 4 of CCR, Title 8. <br /> 5.303.5 Areas of addition or alteration—For occupancies within the Refer to plumbing plans. Contractor/ <br /> authority of the California Building Standards Commission per Installer ✓ 5.506.2 CO2 monitoring—For buildings or additions equipped with Refer to notes on mechanical plans. Jurisdiction No additional <br /> Section 103, the provisions of Sections 5.303.3 shall apply to demand control ventilation, CO2 sensors and ventilation documentation required <br /> new fixtures in additions or areas of alteration to the building. controls shall be specified and installed per California Energy <br /> Code, Section 120.1(c)(4). SSD ARC <br /> 5.303.6 Standards—Plumbing fixtures and fittings shall be installed Refer to plumbing plans. Contractor/ y <br /> in accordance with the CPC, and shall meet applicable Installer 5.507.4 Acoustical control—Employ building assemblies and N/A- Building occupants not likely to be Jurisdiction No additional \��i P�\E A. <br /> standards in Table 1701.1 of the CPC and in Ch. 6 of CGBC. components with Sound Transmission Class (STC)values affected by exterior noise. documentation requiredC':,A <br /> determined in accordance with ASTM E90 and ASTM E413 <br /> 5.304.1 Outdoor potable water use in landscape areas shall N/A- Project scope contains no irrigation. Jurisdiction No additional or Outdoor-Indoor Sound Transmission Class (OITC) <br /> comply with either a local water efficient landscape documentation required determined in accordance with ASTM E 1332. N0. C 30857 <br /> ordinance, or the current California Department of Water �j. REN. 3-31-21 �Q <br /> Resources' Model Water Efficient Landscape Ordinance 5.507.4.1 Exterior noise transmission—At the locations listed N/A- Building not within specified Jurisdiction No additional 9�` <br /> S <br /> (MWELO),whichever is more stringent below, building envelope wall and roof-ceiling assemblies proximity to airports or guideways. documentation required OF <br /> shall have a minimum composite STC rating of 50, and <br /> exterior windows shall have a minimum STC rating of 40: <br /> 5.4 MATERIAL CONSERVATION + RESOURCE EFFICIENCY Within the 65 CNEL noise contour of an airport <br /> • Within the 65 CNEL or Ldn noise contour of a freeway <br /> ✓ 5.407.1 Weather protection—Provide a weather-resistant exterior Refer to Exterior Wall Schedule on the Notation Jurisdiction No additional or expressway, railroad, industrial source, or fixed- <br /> wall and foundation envelope as required by California Floor Plan. documentation required guideway source PUBLISH HISTORY: <br /> Building Code Section 1402.2, manufacturer's installation 5.507.4.1.1 Noise exposure where noise contours not readily N/A- Building not exposed to noise level of Jurisdiction No additional <br /> instructions, or local ordinance,whichever is more stringent. No. DATE PURPOSE <br /> available—Buildings exposed to a noise level of 65 dB 65 dB Leq-1-hr during any hour of operation. documentation required <br /> 5.407.2.1 Moisture control, sprinklers—Design and maintain N/A- Project scope contains no irrigation. Jurisdiction No additional Leq-1-hr during any hour of operation shall have exterior wall 12.17.20 PERMIT SUBMITTAL <br /> landscape irrigation systems to prevent spray on structures. documentation required and roof-ceiling assemblies exposed to the noise source 1 03.12.21 PLAN CHECK#1 <br /> meeting a minimum composite STC rating of 45,with exterior <br /> ✓ 5.407.2.2.1 Moisture control, entries and openings— Refer to architectural plans. Jurisdiction No additional windows of a minimum STC of 40. <br /> At exterior entries and/or openings which are subject to foot documentation required <br /> traffic or wind-driven rain, prevent water intrusion by: 5.507.4.2 Performance method—For buildings located as defined in N/A- Building not within categories of sound Jurisdiction No additional <br /> • using nonabsorbent floor and wall finishes within at least Section 5.507.4.1 or 5.507.4.1.1, wall and roof-ceiling concern. documentation required <br /> 2 feet around and perpendicular to the opening assemblies exposed to the noise source making up the <br /> • providing 4 feet of shelter, through either an awning, an building or addition envelope or altered envelope shall be <br /> overhang, or a recess constructed to provide an interior noise environment <br /> attributable to exterior sources that does not exceed an <br /> ✓ 5.407.2.2.2 Install flashings integrated with a drainage plane. Refer to architectural details. Jurisdiction No additional hourly equivalent noise level of 50dBA in occupied areas <br /> documentation required during any hour of operation. <br /> ✓ 5.408.1 Construction waste management—Recycle and/or Specification Section 017419 Contractor 5.507.4.2.1 Site features—Exterior features such as sound walls or earth N/A- No site features provided to mitigate sound. Jurisdiction No additional <br /> reuse 65% min of nonhazardous construction/demolition berms may be utilized as appropriate to the building, addition documentation required <br /> waste(per Section 5.408.1.1, 5.408.1.2 or 5.408.1.3); or alteration project to mitigate sound migration to the interior. <br /> or comply with local construction/demolition waste <br /> management ordinance,whichever is more stringent. Construction Waste <br /> Management Plan + <br /> V/ 5.408.1.1 Construction waste management plan—Where the local Specification Section 017419 Contractor waste/recycling weight tickets 5.507.4.2.2 Documentation of compliance—An acoustical analysis N/A- Building not within categories of sound Jurisdiction No additional <br /> jurisdiction does not have a construction and demolition and receipts documenting complying interior sound levels shall be concern. documentation required <br /> waste management ordinance that is more stringent, submit prepared by personnel approved by the architect or engineer <br /> a construction waste management plan that complies with or record. <br /> Section 5.408.1.1 <br /> 5.507.4.3 Interior sound transmission—Wall and floor assemblies N/A- Building contains no tenant spaces. Jurisdiction No additional <br /> 5.408.3 Excavated soil and land clearing debris(trees, stumps, N/A Contractor separating tenant spaces from other tenant spaces or public documentation required <br /> rocks and vegetation)shall be 100% reused or recycled spaces shall have an STC of at least 40. WMB PROJECT: <br /> 5.410.1 Recycling by occupants—Provide an area identified and Refer to Notation Floor Plan. Waste hauler Jurisdiction No additional J 5.508.1 Ozone depletion and greenhouse gas reductions— Refer to notes on mechanical plans. Contractor/ Product data for refrigerants 20-042 <br /> used for depositing, storage and collection of non-hazardous permits mixed recycling; no sorting area needed. documentation required Installations of HVAC, refrigeration, and fire suppression Installer and/or fire suppression <br /> recyclable materials. shall not contain CFCs or Halons. materials <br /> 5.410.2 Commissioning for new buildings 10,000 s.f. and greater: N/A-Building is smaller than 10,000 s.f. Final Commissioning 5.508.2 Supermarket refrigerant leak reduction—New commercial N/A- Project contains no commercial Contractor/ Product data for refrigerants <br /> 1. Owner's Project Requirements (OPR) Report refrigeration systems shall comply with the provisions of this refrigerated display cases,walk-in coolers, Installer and/or fire suppression <br /> 2. Basis of Design (BOD) section when installed in retail food stores that both: or walk-in freezers materials <br /> 3. Commissioning Plan T2.2 <br /> 4. Functional Performance Testing have 8,000 s.f. or more of conditioned area <br /> . Documentation and training utilize either refrigerated display cases,walk-in coolers, <br /> 5 <br /> 5. Commissioning Report or walk-in freezers connected to remote compressor <br /> units or condensing units <br /> 3/19/2021 9:30:41 AM Copyright WMB,Inc. <br />