z b �
<br /> g Big 5 ❑ �' � `c0
<br /> riESporting M
<br /> � � N
<br /> Extg service alley Extg service alley PROJECT = Q LO
<br /> EXIT DOOR LANDING SITE U
<br /> EXIT DOOR LANDING is level with the finished m U N
<br /> is level with the finished U) N
<br /> floor of the tenant unit. m U
<br /> floor of the tenant unit.
<br /> - Jack N ❑ElCcc
<br /> N the Box ^� w
<br /> w t
<br /> EL
<br /> Mission Ridge Dr y o
<br /> Extg 3'Exit door w/ Extg 3'Exit door made 0 > �
<br /> rn
<br /> panic hardware 5 into 5'wide door w/ Evaporator Unit fl
<br /> CL
<br /> panic hardware&closer E 100001
<br /> p Ma. 8 Vicinity Map a
<br /> (E)Pony wall to be removed ih ) N
<br /> a> .3 in
<br /> o
<br /> -1 w 177 Min (N)Hall o Walk-in Cooler o D
<br /> °� 69 sq.ft. c bo w/insulated floor St
<br /> W , Q ih 108 sq.ft. Storage Tenant Business Owner:
<br /> 96 sq.ft.
<br /> Suspended Ceiling Ht:10'-11"
<br /> Suspended Ceiling Ht:10'-11" AB t 8'-7" 13'-6" Kuldeep Singh
<br /> 1398 Calhoun Avenue
<br /> Storagft 4'-6" Ripon, CA 95366
<br /> 3: ca 01i
<br /> 282 q Tel: 206-359-0604 w E o r o
<br /> Extg 200A Main Em: kuldeep1592@gmail.com 5 z r � E o c
<br /> o c�, Mn rno o N a� °
<br /> Distribution Panel a �, 0 T C N
<br /> Extg 200A Main (5)Glass display doors Consultant: ° ° °� ° 2
<br /> n-Istrlbutlon Panel T 6' 3 0?r °' Q) _-0 0 ° °
<br /> / to remain Suspended Ceiling Ht:10'-11~ / ~ Benjamin Cantu L Co r�_
<br /> t t Suspended Ceiling Ht:10'-11" N ° 3 °— o
<br /> BC Planningo N 6= °
<br /> _ o � m w
<br /> •o E
<br /> 3'Insulated o N �
<br /> C,
<br /> dor 829 Mellon Avenue '3 �, E cu
<br /> 17'-10" Manteca, CA 95337 2-- cL x
<br /> _ !Z
<br /> `7 L-6 N1
<br /> Tel: 209-679-5204 y o N L
<br /> Em: bcantu@sg50.com o o = a o° E T
<br /> 0
<br /> 24„ 4„ rn o E L) 0
<br /> _ o
<br /> N N-° .�.. o C N
<br /> MopOsink Water ° ° °.3 U E
<br /> Heater Site Info: °1= Iz ° E
<br /> Extg 125A Sub-panel _if 0 m o g
<br /> to be removed
<br /> Q o Address: 1031 S Main Street00
<br /> -------------- -0 w
<br /> 24' " O Q APN: 219-350-43
<br /> o ! l Size: 2.53 acres (shopping center)
<br /> (Neighborhood0 NC Commercial)
<br /> ,' ee'•s•
<br /> Water '�, Water l Wash Basin Zone' C_
<br /> N (Neighborhood Commercial)Ht:10'11" Heater Suspended CeilinHt:10-11" Heater
<br /> v Extg metal structural Extg. Use: General Commercial Center
<br /> Janitor/Utility 12'-8•. pole(to remain) / Proposed: No change
<br /> Room Q Extg mop sink and
<br /> —►* Display Freezer
<br /> - w insulated °°r Unit Area: 2,923 s ft. Gross
<br /> Relocate(E) _______= a 171 sq.ft. q' ( )
<br /> Office water heater relocated
<br /> water heater Extg metal structural 0 114 sq.ft. into Store Room;cap 5'-3" 3'-0" 5'-9" T-0"
<br /> Storage and mop sink Extg partition to be pole(to remain)
<br /> Is i
<br /> drain at floor level
<br /> removed s'-1 o° 2„ Main Building Code Data: Q
<br /> �_
<br /> _____
<br /> Land Use: Commercial Center W
<br /> g �° Grou Occupancy: M
<br /> 3-4" I I 3'-6" � Group
<br /> Occupancy:
<br /> Ex? ------------------------ T N Type Const.: Type V-B W
<br /> (E)3'Door to r main N ;; 2a~zea'
<br /> Mop sink a Allowable Stories: Two
<br /> ---------
<br /> a Building Stories: One O
<br /> Remove extg Y door (N)3030 Fixed Extg Y door (N)3030 Fixed Allowable Floor Area: 9,000 sq.ft.
<br /> opening O w/closer O c� BuildingArea Tenant 2,923 s ft. (gross)
<br /> Suspended Ceiling Ht:10'-11" 1 1 (Tenant): q'
<br /> Remainingsuspended ceiling rid Suspended Ceiling Ht 10'-11~
<br /> p g g � = Allowable Building Height: 40'
<br /> Hall system to be repaired if necessary (E)HallAA �A c� w
<br /> Doors with closers shall co o Building Height: 16'
<br /> after removal of partitions 46 sq.ft.
<br /> �.,, be adjusted so that from g'_g" "v Retail o � Fire Sprinklers: Yes
<br /> 91-91, an open position of 90 1,949 sq.ft. Total Occupant Load: 35
<br /> (E)YDr to remain ! degrees,the time (N)3'door ❑2 0
<br /> w
<br /> required to move the
<br /> door to a position of 12 ------------------------
<br /> SuspendedCeilin Ht:1x-11" - Occupant Load Breakdown: 2016 CBC Table 1004.1.2
<br /> (E)Lavatory Remove(E)Lavatory; g 5 seconds minimum.
<br /> is GeeS,- (" (E)-Lavatory p ( )
<br /> to remain o ��cap drain in wall �\�gee `•, o
<br /> 39'-0" O
<br /> Extg Accessible
<br /> Extg Accessible _______ _ Office: 114 sq. ft. (100) 1
<br /> Proposed Occupancy
<br /> Women s Restroom 30 48"Cle�ran e
<br /> D
<br /> Remove ra n wallr � � ' � Me�s)RestrOtyom Unisex restroom shall Q ResAccessible '; Retail (Mercantile): 1,805 sq.ft. (60) 30 ~
<br /> The existing door to the Unisex
<br /> O y 'room Storage/Walk-ins: 708 sq.ft. (300) 2 O
<br /> Remove E Lavatory; __
<br /> -------------------
<br /> r , i 5'x5'Clearence '
<br /> p f„� be changed to open sq;ft. Restroom: 97 sq.ft.
<br /> Remove all extg_ -_-'_ _ _____ ca drain in wall Extg 8'Cetiing Halls: 115 sq.ft.
<br /> ............
<br /> p into the restroom. O
<br /> cubical partitions
<br /> ----------
<br /> Net Occupancy 33
<br /> Extg 8'Ceiling w
<br /> 5'-3" ' ^
<br /> =` — EMgmetal structural 3'0° 3'-0° 5'6° Re wired Exits: Two 2 2016 CBC Table 1006.2.1
<br /> Extg 8'Ceiling - Q o m Extg metal structural q ( ) ( )
<br /> (E)Toilet Remove(E)Urinal; Q pole(to remain) !16•-17^ (E)Toilet
<br /> 3 pole(to remain)
<br /> o �telocated
<br /> to remain cap drain in wall .Q Urinal Exits provided: Two (2)
<br /> 3 o Illustrated store gondola are f U
<br /> a> .°N' = space allocation purposes only o a)
<br /> Replace extg demolished ceiling °' __ a separate permit and approval
<br /> = o�
<br /> framingover the restrooms w/ s ° is required for gondolas. o w
<br /> o o o Q Provide R-15 IY a
<br /> suspended ceiling grid system E is in insulation in new wall v c
<br /> 02 a N Project Description & Building
<br /> a n O
<br /> o o Compliance Notes:
<br /> --s--, r--i_--- E rq Q
<br /> Remove(E)Toilet;cap 'A -' Remove(E)Toilet;cap
<br /> drain below floor level r y ` °' T-0" 4'-0" 1. This project involves the conventional
<br /> drain below floor level o
<br /> ___ ----
<br /> '.2
<br /> Gondola store tenant improvements construction of a retail U
<br /> °�' m CL ( Yp) /2"HB store within the existing main building
<br /> c fixtures T g g
<br /> y envelope. No change (structural or otherwise)
<br /> Extg partition tobeto the main structure is proposed. The project QI
<br /> ° removed 3'-0" will involve the removal of non-bearing � U
<br /> Sink (Typ) co partitions and reduction of plumbing fixtures, w
<br /> and the installation of refrigerated display
<br /> cases, a walk-in cooler, display gondolas, t--�
<br /> "' and minor plumbing changes. One existing I� Z
<br /> Extg sink/cabinets to be removed. ADA accessible restroom will be removed and 1--1
<br /> Cap drain below floor level one will be remodeled into a single unisex
<br /> accessible restroom.
<br /> 2. New construction will not involve altering ~
<br /> P existing bearing walls, center columns, or
<br /> ? roofing. All work occurs in the interior of the
<br /> w O
<br /> 6, 2 5'-0" building.
<br /> 3. Work involved in the remodel shall comply v w
<br /> Cap all extg shampoo sinks Suspended Ceiling Ht 10'-11" with 2016 California Building Code, 2016 w
<br /> Secure Storage
<br /> plumbing below floor level; o LL California Electrical Code, 2016 California
<br /> Accessible 47 S ft.
<br /> replace the to match extg floor a'Cashier POS s'Shelved Cashier POS o M q' Q Plumbing Code, 2016 California Mechanical H�
<br /> 38"High Max. Display Case 34"High Max. ZV
<br /> C14 Code, 2016 California Green Building
<br /> z Standards Code, 2016 California Fire Code,
<br /> and Building Energy Efficiency Standards. Z
<br /> Suspended Ceiling Ht.,1W-11" 9) 4. No change is proposed to the existing
<br /> io $ `' HVAC roof mounted units and interior W
<br /> Suspended Ceiling Ht:10'41" o
<br /> r o bp distribution system. w
<br /> q @= Suspended Ceiling Ht.10'-11"
<br /> 5. Property is not subject to flooding.
<br /> a" z 6. Existing topography is relatively flat.
<br /> 7. The building has a fire sprinkler system.
<br /> Plans preparation and submittal for
<br /> n k modification of the existing fire sprinkler M
<br /> system will be conducted by others. O
<br /> Extg storefront windows w/3'double doors Extg storefront windows w/T double doors
<br /> EXIT DOOR LANDING ~
<br /> is level with the finished
<br /> EXIT DOOR LANDING ENTRANCE/EXIT ENTRANCE/EXIT floor of the tenant unit.
<br /> is level with the finished r rr
<br /> Existing Wall Key: floor of the tenant nit. 49-4
<br /> Existing partitions to remain as is. No change is proposed to
<br /> Demolition Floor Plan Scale: 1/4" — 1 ,-�„ the existing HVAC equipment
<br /> Existing nonbearing partition to be removed. N and distribution system. Remodeled Floor PIan Scale: 1 /4" = 1 �—D1t N Restroom Plumbing Fixtures: (2016 CPC Chap 4, Table 422.1)
<br /> Roof access to the roof mounted
<br /> HVAC equipment is located at the Group M(Retail): (Table A)
<br /> end of the building.(See site plan.) Retail floor area 1,805 sq. ft. (200) 9.0 occupants
<br /> New Windows Schedule Store office 114 sq. ft. (200) .5 occupants
<br /> Storage, walk-ins 708 sq. ft. (5,000) 1 occupants
<br /> No. Qty Width* Height* Type Wind Ht Material SafetyGlaz Above Fl. Panes Screen U-value SHGC Remarks Remodeled Wall Key: (Less restroom, halls) 9.6
<br /> O2 3'-0" 3'-0" Fixed 6-8" Vinyl Yes 44" Double No 0.27 0.24
<br /> Existing partitions to remain as is. Occupant factor: 10 occupants
<br /> Remodeled Room Surface Covering & Finish
<br /> In accord with CBC Section 803 and ASTM E 84 or LIL7223,lobby finish materials shall comply with Class B flame spread index 26-75 and smoke developed index O 1 2'-0" T-0" Fixed U-8" Vinyl Yes 44" Double No 0.27 0.24
<br /> 0450;and finish materials in other others shall comply with Class C flame spread index 75-200 and smoke developed index 0-450. New nonbearing partition w/ 1/2" sheetrock Existing Fixtures: Men: 1-toilet, 1-urinal & 1-lavatory.
<br /> Room/Area wall(s) Floor Ceiling Base trim Class Index Height Color Remarks 1 2 0 each side (moisture-proof sheetrock in Women: 1-toilet& 1-lavatory.
<br /> O O O
<br /> Retail/Halls Semi-gloss paint Extg 16"x16"ceramic tExtg T-bar w/2'x4' Floor to he Min.5"vinyl base Class C TBD restroom.
<br /> panels ceiling
<br /> Q °°Provided Fixtures: Unisex restroom w/ 1-toilet, 1-urinal &
<br /> Extg T-bar w/2'x4' Floor to OStora a Rm Semi-gloss paint Ext 16"x16"ceramic the panels Min.5vinyl base Class C ceiling TBD
<br /> 1-lay. per CPC 422.2(2). No drinking fountain per CPC 415.2. H N
<br /> Extg T-bar w/2'x4' Floor to *Nominal Q 0
<br /> Q Office Semi-gloss paint Extg 16"x16"ceramic tile panels Min.5"vinyl base Class C ceiling TBD Z O �-
<br /> 4'High FRP panels;semi- Sheetrock w/Semi- Floor to N a
<br /> Q Unisex Restroom gloss paint panels&walls Extg 16"x16"ceramic the gloss paint Min.5"vinyl base Class C ceiling white FRP wall panels floor to 4'high. New Doors Schedule 'Substitute shall be equivalent or better Q
<br /> © Extg T-bar 2'x4' Floor to
<br /> Secure Storage Semi-gloss paint Extg 16"x16"ceramic the Qty Type Min.5"vinyl base Class C TBD No. Qr
<br /> panels telling *ManuPr. 'Model# Door type *Material Width Hgt. Thick Frame Core Handing Finish Insulate Label' Closer Anchor Lock Type Safety G/az Operation Window/Lite Remarks
<br /> PLANS INDEX
<br /> Provide ADA handle outside&panic bar Accessibility. Q
<br /> Q 1❑ 1 Delivery DKS 1600 16 F Flush 16 ga Latch w/60" 80" 1.75" Steel Poly LH Prime No 3hr/PP/S Yes SS No No
<br /> Steel Panic bar inside Sheet No. Plan Title
<br /> 0 Project was determined in �
<br /> 1 Interior Masonite 07139 Flush Hardwood 36" 80" 1.75" Solid LH Prime No No SS Deadbolt No No Provide ADA handle outside 1 Demo/ Remodel Floor Plans
<br /> 0 compliance with accessible 2 Electrical Plan
<br /> path of travel features per 3 Plumbing /Accessibility Plans
<br /> 0 1 1 1 1 1 1 1 1 1 1 2016 CBC Section 11 B-202.4. 4 Construction Detail
<br /> Inside view
<br /> ❑1 ❑2 4❑ — 5 Roof Equip /Site Plans
<br /> All exterior doors to be weather-stripped and have thresholds. 6 Title 24
<br /> Abbreviations:Poly=Polystyrene;Hony=Honeycomb;RH=Right hand;LH=Left hand;CR=Standard arm closer;PR=Parallel arm closer;WS=Wood stud anchor;SS=Steel stud anchor;MA=Masonry wall anchor;Anod Alum=Anodized Aluminum;3hr-Fire rated,PP=Positive pressure,S=Smoke.
<br />
|