Laserfiche WebLink
Kith, Michael <br /> From: Alfred Martinez <a1mar2tinez3@gmail.com> <br /> Sent: Wednesday, April 15, 2020 3:09 PM <br /> To: Lal Toor <br /> Cc: cvseptic@att.net; Fox,Wayne; Nino, Monica [CAO]; rcastrolaw2@gmail.com; Regalo, <br /> Sandra [CAO]; Kith, Michael <br /> Subject: Re: Shady Rest Septic Issues <br /> Lal, <br /> I have just spoken with counsel. You need to retain a Stockton attorney and file a writ of mandamus in Superior <br /> Court immediately. The County's letter dated October 29, 2020 does allow them to require, modify, or construct <br /> a new set of permit requirements. The new permit costs outlined by EHD must be borne by the County since <br /> they are extraordinary and excessive. <br /> 1. The condition of seepage pits at the end of each row. This will require your contractor to <br /> uncover some pits. (4th new demand, but the County may be correct here). <br /> 2. Soil profile at 35 feet. This will require as test hole to 35 ft. (5 new requirement...exceeds <br /> County's authority 35' feet would have to be required of all permittees at all times, more bad <br /> faith) . <br /> 3. A percolation rate at 35 feet if soil profile is favorable at that depth (6th <br /> demand...percolation rate has already been established; more bad faith; a new percolation rate is <br /> not required). <br /> Thank you <br /> Alfred <br /> On Wed, Apr 15, 2020 at 11:45 AM Kith, Michael <mkith@,siov.or >wrote: <br /> Hello Mr. Toor, <br /> On Monday April 13, 2020, the director of Environmental Health Department(EHD),Naseem of EHD and I <br /> visited the dispersal field of Shady Rest with your contractor, Paul of Central Valley Septic. Wastewater was <br /> overflowing from the tank and some seepage pits. <br /> To better assist you in evaluating your current system and repair, the EHD would like to have the following <br /> information: <br /> 1 <br />