My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WP0040203
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUIS PARK
>
0
>
4200/4300 - Liquid Waste/Water Well Permits
>
WP0040203
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2021 9:38:13 AM
Creation date
12/13/2021 9:10:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
WP0040203
PE
4372
STREET_NUMBER
0
STREET_NAME
LOUIS PARK
City
STOCKTON
Zip
95203-
APN
13306001
ENTERED_DATE
10/23/2019 12:00:00 AM
SITE_LOCATION
0 LOUIS PARK
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Supplemental fields
CYEAR
2019
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nationwide Permit 6 Summary <br />NWP authorization, instead of components of a <br />compensatory mitigation plan (see 33 CFR <br />332.4(c)(1)(ii))• <br />❑ (g) Compensatory mitigation will not be used to <br />increase the acreage losses allowed by the acreage limits <br />of the NWPs. For example, if an NWP has an acreage <br />limit of 12 -acre, it cannot be used to authorize any NWP <br />activity resulting in the loss of greater than 1/2- acre of <br />waters of the United States, even if compensatory <br />mitigation is provided that replaces or restores some of <br />the lost waters. However, compensatory mitigation can <br />and should be used, as necessary, to ensure that an NWP <br />activity already meeting the established acreage limits <br />also satisfies the no more than minimal impact <br />requirement for the NWPs. <br />❑ (h) Permittees may propose the use of mitigation <br />banks, in -lieu fee programs, or permittee -responsible <br />mitigation. When developing a compensatory mitigation <br />proposal, the permittee must consider appropriate and <br />practicable options consistent with the framework at 33 <br />CFR 332.3(b). For activities resulting in the loss of <br />marine or estuarine resources, permittee -responsible <br />mitigation may be environmentally preferable if there are <br />no mitigation banks or in -lieu fee programs in the area <br />that have marine or estuarine credits available for sale or <br />transfer to the permittee. For permittee -responsible <br />mitigation, the special conditions of the NWP verification <br />must clearly indicate the party or parties responsible for <br />the implementation and performance of the compensatory <br />mitigation project, and, if required, its long-term <br />management. <br />❑ (i) Where certain functions and services of waters of <br />the United States are permanently adversely affected by a <br />regulated activity, such as discharges of dredged or fill <br />material into waters of the United States that will convert <br />a forested or scrub -shrub wetland to a herbaceous wetland <br />in a permanently maintained utility line right-of-way, <br />mitigation may be required to reduce the adverse <br />environmental effects of the activity to the no more than <br />minimal level. <br />❑ 24. Safety of Impoundment Structures. To ensure that all <br />impoundment structures are safely designed, the district engineer <br />may require non -Federal applicants to demonstrate that the <br />structures comply with established state dam safety criteria or <br />have been designed by qualified persons. The district engineer <br />may also require documentation that the design has been <br />independently reviewed by similarly qualified persons, and <br />appropriate modifications made to ensure safety. <br />❑ 25. WateY r_ -Quality. Where States and authorized Tribes, or <br />EPA where applicable, have not previously certified compliance <br />of an NWP with CWA section 401, individual 401 Water <br />Quality Certification must be obtained or waived (see 33 CFR <br />330.4(c)). The district engineer or State or Tribe may require <br />additional water quality management measures to ensure that the <br />authorized activity does not result in more than minimal <br />degradation of water quality. <br />❑ 26. Coastal Zone Management. In coastal states where an <br />NWP has not previously received a state coastal zone <br />management consistency concurrence, an individual state coastal <br />Page 6 <br />zone management consistency concurrence must be obtained, or <br />a presumption of concurrence must occur (see 33 CFR 330.4(d)). <br />The district engineer or a State may require additional measures <br />to ensure that the authorized activity is consistent with state <br />coastal zone management requirements. <br />❑ 27. Regional and Case -By -Case Conditions. The activity <br />must comply with any regional conditions that may have been <br />added by the Division Engineer (see 33 CFR 330.4(e)) and with <br />any case specific conditions added by the Corps or by the state, <br />Indian Tribe, or U.S. EPA in its section 401 Water Quality <br />Certification, or by the state in its Coastal Zone Management <br />Act consistency determination. <br />❑ 28. Use of Multiple Nationwide Permits. The use of <br />more than one NWP for a single and complete project is <br />prohibited, except when the acreage loss of waters of the United <br />States authorized by the NWPs does not exceed the acreage limit <br />of the NWP with the highest specified acreage limit. For <br />example, if a road crossing over tidal waters is constructed under <br />NWP 14, with associated bank stabilization authorized by NWP <br />13, the maximum acreage loss of waters of the United States for <br />the total project cannot exceed O -acre. <br />❑ 29. Transfer of Nationwide Permit Verifications. If the <br />permittee sells the property associated with a nationwide permit <br />verification, the permittee may transfer the nationwide permit <br />verification to the new owner by submitting a letter to the <br />appropriate Corps district office to validate the transfer. A copy <br />of the nationwide permit verification must be attached to the <br />letter, and the letter must contain the following statement and <br />signature: <br />When the structures or work authorized by this <br />nationwide permit are still in existence at the time <br />the property is transferred, the terms and conditions <br />of this nationwide permit, including any special <br />conditions, will continue to be binding on the new <br />owner(s) of the property. To validate the transfer of <br />this nationwide permit and the associated liabilities <br />associated with compliance with its terms and <br />conditions, have the transferee sign and date below. <br />(Transferee) <br />(Date) <br />❑ 30. Compliance Certification. Each permittee who <br />receives an NWP verification letter from the Corps must provide <br />a signed certification documenting completion of the authorized <br />activity and implementation of any required compensatory <br />mitigation. The success of any required permittee -responsible <br />mitigation, including the achievement of ecological performance <br />standards, will be addressed separately by the district engineer. <br />The Corps will provide the permittee the certification document <br />with the NWP verification letter. The certification document will <br />include: <br />❑ (a) A statement that the authorized activity was done <br />in accordance with the NWP authorization, including any <br />general, regional, or activity -specific conditions; <br />
The URL can be used to link to this page
Your browser does not support the video tag.