Laserfiche WebLink
4 ! 5 %r <br />MATERIAL FOR DEP WELL ANODES <br />Lip Tv? T/GHT S69L : R3 YfR SRN .7017011N eahVrY ITEM OLIANT DESCRIPTION 1 CODE NO <br />HERLTH IJ/STP,/lT. I L ANODES 3"X84'DURICHj.5 <br />LC1N1 TYPE TA -3 WITH 56-935! <br />125' •B I1MWPE wIRC <br />I ` VALVE FRAME \ _ <br />COVER <br />i2 2 600 LBS COKE BREEZE BACKFILL HM -CN OR LESS 56.70E6 <br />j 9 10 SEE NOTE I 3 AS R(0'0 WIRE 110 AWG RNY/6N OR M}1WPE 29-43' <br />E CONDUIT TO POLE MOUNTED OR a 9 PIPE CLAMPS 6 CENTERING GUIDE <br />L-NGERGROUND RECTIFIER, ISF.E GS 0-11.11.5 1 1-1/4' ABS PLASTIC 180• TURN <br />�:____: -- WRAP UNDERGROUND PORTION OF CONDUIT <br />WITH PLASTIC TAPE IF CONDUIT IS METALLIC. F 140' I -I/4• ABS PLASTIC DUCT TYPE D8 36-0469 <br />} �S 3 7 1 1-1/4• TEMP PLASTIC CAP <br />B 30 IPLASTIC TIE LOCKS <br />SEAL ENO OF CONDUIT WITH TAC-TAPF. 9A I VALVE FRAME <br />CODE 50-7036. IAOUA SEAL. CODE 50-1030 98 1 12' EXTENSION SEE Gas 510 K40 -K40.1 <br />oT O MAY BE USED, BUT TAC -TAPE <br />S f f NOT[ .1 IS PREFERRED FOR GAS DEPARTMENT USEI 9C I VALVE BOX COVER <br />10 1 TEST LEAD BOX. SEE GAS STD 0-10.1 <br />1 11 S REO'0 CONCRETE <br />I SEE NOTE H 3/16 12 1 SPLICE, ANODE WIRE, SEE GAS STD 0-12 <br />WELDING RFD/W <br />Is <br />CENTERING <br />DEVICE <br />2 SEE NOTE G FOR INSTALLATION PROCEDURE NOTES: <br />} D/W ANODEA. DRILL A 10' DIAMETER HOLE 120 FT DEEP AT CHOSEN LOCATION. <br />8 SEE NOTE C B. ASSEMBLE ANODES AND 1-1/4•DLCT AS SHOWN•OBSERVE SPACING. <br />C. TADS OR STRAP ANODE WIRE TO ixE OUTSIDE OF THE VENT PIPE EVER► 4'. <br />0. NOTIFY THE RESPONSIBLE DISTRI-T OR DIVISION ENGINEER WHEN ANODES ARE TO <br />1 F_ AABE INSTALLED SO THAT HE OR A CORROSION MECHANIC CAN BE PRESENT. <br />E. WHEN USING MID TO SUPPORT THE WAILS OF THE HOLE, THIN MUD OUT WITi <br />CONDU.IT CLEAR WATER PRIOR TO INSTALLING COKE BREEZE. <br />11 F. LOWER ASSEM& ED ANODE STRING AND 1-1/4'DUC7 INTO'HOU USING SUITABLE UNE. <br />. ` <br />CLAMP. CHAIN LINK �JNTIL CONTACT WITN BOTTOM IS MADE. BE CAREFUL WITH ARGUE LEAD WIRES. <br />FENCE. S12ED TO G. HOLD ANODES IN POSITION AND KEEP VIRES TAUT WHILE POURING IN EDO LBS. <br />FIT ANODE Of COKE BREEZE. MEASURE DEPTH TO TOP OF COr.E BREEZE. TOP OF COKE <br />C i ; ANODE GLIDE CAv BE EITHER BREEZE COLUMN SHALL BE 90 FEET FROM SURFACE. ADD COKE BREEZE <br />WELDED TO CLA7tN OR CLAMPED AS REOUIRED. <br />1 TO ANODE AND BENT TO S`IAPE <br />E �IL (DEEP WELL) ANODE CENTERING Of.VICE H. `ILL HOLE WITH CONCRETE'(CLASS B MIX -3 SACKS OF PORTLAND CEMENT PER <br />CUBIC YARD). <br />DETAIL D A D I. SEE GAS STANDARD 0-10.1 FOR TEST LEAD BOX OPTIONS. <br />LOCATE NEAR BASE OF POWER POLE. WIRES NAY <br />ALSO BE SPLICED INSIDE U.'1DERGROUND RECTIFIER CONCRE'E BOX (GS 0 11.11. <br />J. ALL WORK SHALL BE DONE IN ACCORDANCE WITH DEPT. OF WATER RESOURCES <br />BULLETIN, WATER WELLS 6 CATHODIC PROTECTION WELLS (SEC 13700-13806 <br />A'• I CALIF. WATER CODE). <br />NJ7_ !$ NOTE: <br />1 I J 1. SLOTS FOR VENTILATION OF CHLORINE GAS SHALL BE INSERTED IN <br />THE LOWER 30' OF THE 1-1/4' ABS DUCT. EA=H SLOT SHALL BE <br />ROTATED 90' FROM THE PREVIOUS SLOT. CUT SLOT W/CIRCULAR SAW. <br />- 2'X1/16' SLOT i. <br />(SEE NOTE 1) �J <br />TYPICAL �. INSTR!l A L/HTfR ;f/fC? VAL%f <br />ml 7 AND INS&7 SiRMV.�j -1 - <br />-- <br />SEE DETAIL 'E'10. <br />VENTILATION SLOTS <br />DETAIL D E ° CENTERING GUILE <br />�T �E�,TIOtd A <br />� o .:dVI DEVISED DE LIL .�GC�eIA+ P(v•SID.'C <br />C.DD 821064 06i17/E2 I <br />lfAVSIEC ow.C.D.I <br />REv IS 10•S <br />• PIPING -DATA SHEET <br />01GLIST <br />CT•_. .1.A INSTALLATION OF:ANODES SnOS <br />120' DEEP UVSD 9T <br />t - o c <br />OA. -'WS STANDARD Gq <br />(1 L 6- <br />DJ -t7- 2 <br />SCn6 PACIFIC GAS AND ELECTRIC COMPANY 2873835 <br />SAN FRANCISCO,CALIFORMIA <br />.. . .. .-�. ..,_. .- .-.. ..•..• ..P.�� w.... Y•}:. ... .. .q:a••... . .. ..., is Y.'N„a �./S%.: .,.N.y: t. i... <br />0 <br />w <br />N <br />