My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_JULY 2014 FINAL RCSI
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieve Reports
>
ARCHIVED REPORTS_JULY 2014 FINAL RCSI
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 11:36:58 AM
Creation date
12/16/2021 11:39:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
JULY 2014 FINAL RCSI
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />Forward Composting Facility SWT Engineering <br /> Report of Composting Site Information – July 2014 <br />z:\projects\allied waste\forward\resource recovery facility\5 yr permit rvw 2013-14\rcsi 2014\text\rcsi toc.doc <br />FORWARD COMPOSTING FACILITY <br />REPORT OF COMPOSTING SITE INFORMATION <br /> <br />TABLE OF CONTENTS <br /> <br />1.0 FACILITY OVERVIEW ........................................................................................................... 1-1 <br /> 1.1 Introduction ......................................................................................................... 1-1 <br /> 1.2 Site Location ........................................................................................................ 1-2 <br /> 1.2.1 Site Location Map ................................................................................ 1-2 <br /> 1.2.2 Site Facilities/Features ....................................................................... 1-2 <br /> 1.2.3 Surrounding Land Use ......................................................................... 1-3 <br /> 1.3 Quantity of Materials to be Accepted ................................................................ 1-4 <br /> 1.3.1 Maximum Daily Load Capacity ............................................................ 1-5 <br /> 1.3.2 Average Daily Throughput ................................................................... 1-5 <br /> 1.3.3 Average Load Capacity Next Five Years ............................................. 1-6 <br /> 1.3.4 Design Capacity .................................................................................... 1-6 <br /> 1.3.5 Feedstock Material Types.................................................................... 1-6 <br /> 1.4 Types and Numbers of Vehicles Anticipated to Enter the Facility ................... 1-6 <br />2.0 COMPOST PROCESSING SITE DESIGN, MONITORING, AND SITE IMPROVEMENTS ...... 2-1 <br /> 2.1 Composting Site Design ..................................................................................... 2-1 <br /> 2.1.1 Site Plan ................................................................................................ 2-1 <br /> 2.1.2 Design Details ...................................................................................... 2-3 <br /> 2.1.3 Facility Construction ............................................................................ 2-5 <br /> 2.1.4 Grading and Drainage Plan ................................................................. 2-6 <br /> 2.1.5 Pad Composition and Dimensions ...................................................... 2-7 <br /> 2.1.6 Drainage Control .................................................................................. 2-7 <br /> 2.1.7 Leachate Control .................................................................................. 2-8 <br /> 2.1.8 Site Access ........................................................................................... 2-9 <br /> 2.1.9 Development Stages ............................................................................ 2-9 <br /> 2.1.10 Amendments and Additives ................................................................ 2-9 <br /> 2.1.11 Physical Site Conditions Report ....................................................... 2-10 <br /> 2.2 Monitoring ........................................................................................................ 2-13 <br /> 2.3 Composting Site Improvements ...................................................................... 2-14 <br /> 2.3.1 Identification Signs ........................................................................... 2-14 <br /> 2.3.2 Entry Signs ......................................................................................... 2-15 <br /> 2.3.3 Facility Security ................................................................................. 2-15
The URL can be used to link to this page
Your browser does not support the video tag.