Laserfiche WebLink
MONITORING AND REPORTING PROGRAM NO. R5-2014-0006 <br />FORWARD INC. AND REPUBLIC SERVICES INC. <br />FORWARD CLASS II LANDFILL <br />SAN JOAQUIN COUNTY <br />13 <br />The Discharger shall retain records of all monitoring information, including all <br />calibration and maintenance records, all original strip chart recordings of continuous <br />monitoring instrumentation, copies of all reports required by this Order, and records of <br />all data used to complete the application for this Order. Records shall be maintained <br />throughout the life of the facility including the post-closure period. Such records shall <br />be legible and shall show the following for each sample: <br /> <br />a) Sample identification and the monitoring point or background monitoring point <br />from which it was taken, along with the identity of the individual who obtained the <br />sample; <br />b) Date, time, and manner of sampling; <br />c) Date and time that analyses were started and completed, and the name of the <br />personnel and laboratory performing each analysis; <br />d) Complete procedure used, including method of preserving the sample, and the <br />identity and volumes of reagents used; <br />e) Calculation of results; and <br />f) Results of analyses, and the MDL and PQL for each analysis. All peaks shall be <br />reported. <br />Required Reports <br />1) Quarterly Monitoring Report: Monitoring reports shall be submitted quarterly and <br />are due on 1 May, 1 August, 1 November and 1 February. Each quarterly monitoring <br />report shall contain at least the following: <br />a) For each groundwater monitoring point addressed by the report, a description <br />of: <br />1) The time of water level measurement; <br />2) The type of pump - or other device - used for purging and the elevation of <br />the pump intake relative to the elevation of the screened interval; <br />3) The method of purging used to stabilize water in the well bore before the <br />sample is taken including the pumping rate; the equipment and methods <br />used to monitor field pH, temperature, and conductivity during purging; <br />results of pH, temperature, conductivity, and turbidity testing; and the <br />method of disposing of the purge water; <br />4) The type of pump - or other device - used for sampling, if different than the <br />pump or device used for purging; and <br />5) A statement that the sampling procedure was conducted in accordance with <br />the approved Sample Collection and Analysis Plan.