My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_JULY 2014 FINAL RCSI
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieved Reports
>
ARCHIVED REPORTS_JULY 2014 FINAL RCSI
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 11:36:58 AM
Creation date
12/16/2021 11:39:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
JULY 2014 FINAL RCSI
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD PROVISIONS AND REPORTING REQUIREMENTS, JANUARY 2012 - 25 - <br />FOR WASTE DISCHARGE REQUIREMENTS <br />FOR DISCHARGES REGULATED BY SUBTITLE D AND/OR TITLE 27 <br /> <br /> <br />verbally notify Central Valley Water Board staff and provide written notification <br />by certified mail within 7 days of such determination, and within 90 days shall <br />submit an amended report of waste discharge to establish an Evaluation <br />Monitoring Program [Title 27, § 20385(a)(3) and § 20420(l)(1) & (2)]. <br /> <br />J. RESPONSE TO A RELEASE <br /> <br />1. Measurably Significant Evidence of a Release Has Been Confirmed. If the <br />Discharger has confirmed that there is measurably significant evidence of a <br />release from a waste management unit pursuant to Standard Monitoring <br />Specification I.46 or I.47, then the Discharger shall: <br />a. Immediately sample all monitoring points in the affected medium at that <br />waste management unit and determine the concentration of all monitoring <br />parameters and constituents of concern for comparison with established <br />concentration limits. Because this constituent of concern scan does not <br />involve statistical testing, the Discharger will need to collect and analyze <br />only a single water sample from each monitoring point in the affected <br />medium [Title 27, § 20420(k)(1)]. <br /> <br />b. Within 14 days of confirming measurably significant evidence of a release, <br />the Discharger shall (for releases from MSW landfill units) notify all persons <br />who own the land or reside on the land that directly overlies any portion of <br />the plume of contamination if contaminants have migrated off-site if <br />indicated by sampling of detection monitoring wells [40 C.F.R. <br />§ 258.55(g)(1)(iii)]. <br /> <br />c. Within 90 days of confirming measurably significant evidence of a release, <br />the Discharger shall submit an amended report of waste discharge to <br />establish an Evaluation Monitoring Program meeting the requirements of <br />Title 27, sections 20420(k)(5)(A-D), including but not limited to the results of <br />sampling pursuant to paragraph J.1.a, above. The Evaluation Monitoring <br />Program shall be designed for the collection and analysis of all data <br />necessary to assess the nature and extent of the release and to determine <br />the spatial distribution and concentration of each constituent throughout the <br />zone affected by the release [Title 27, § 20420(k)(5) and § 20425(b)]. For <br />releases from MSW landfill units, the Evaluation Monitoring Program shall <br />also include any additional proposals necessary to comply with 40 C.F.R. <br />§ 258.55, particularly the additional monitoring well required by 40 C.F.R. <br />§ 258.55(g)(1)(ii). <br /> <br />d. Within 180 days of confirming measurably significant evidence of a <br />release, the Discharger shall submit to the Central Valley Water Board an <br />initial engineering feasibility study for a Corrective Action Program <br />necessary to meet the requirements of Title 27, section 20430. At a <br />minimum, the initial engineering feasibility study shall contain a detailed
The URL can be used to link to this page
Your browser does not support the video tag.