Laserfiche WebLink
FORWARD COMPOST FACILITY <br />ODOR IMPACT MINIMIZATION PLAN <br /> <br />TABLE OF CONTENTS <br /> <br />SECTION PAGE <br /> <br />Forward Compost Facility i SWT Engineering <br />Z:\PROJECTS\Allied Waste\Forward\Resource Recovery Facility\5 Yr Permit Rvw 2013-14\RCSI 2014\Appendices\App E-OIMP\OIMP <br />TOC.doc <br />1.0 INTRODUCTION AND PURPOSE 1 <br /> <br />1.1 Odor Monitoring Protocol 2 <br /> <br /> 1.1.1 Proximity of Odor Receptors 2 <br /> 1.1.2 Method for Assessing Odor Impacts 2 <br /> <br />1.2 Climatic Conditions 3 <br /> <br /> 1.2.1 General Conditions 3 <br /> 1.2.2 Wind Velocity and Direction 3 <br /> 1.2.3 Weather Event Impacts 4 <br /> <br />2.0 COMPLAINT RESPONSE PROTOCOL 4 <br /> <br />3.0 OPERATIONS PROCEDURES AND DESIGN TO MINIMIZE ODORS 4 <br /> <br />3.1 Aeration 5 <br />3.2 Moisture Content of Materials and Moisture Management 5 <br />3.3 Feedstock Characteristics and Quality 5 <br />3.4 Airborne Emission Controls 6 <br />3.5 Drainage Controls 6 <br />3.6 Pad Maintenance 6 <br />3.7 Process/Wastewater Controls 6 <br />3.8 Material Processing, Handling, and Storage Practices 7 <br /> <br />3.8.1 Processing 7 <br /> <br /> 3.8.1.1 Feedstock 7 <br /> 3.8.1.2 Processed Material 7 <br /> <br />3.8.2 Pile Geometry 8 <br /> <br /> 3.8.2.1 Feedstock 8 <br /> 3.8.2.2 Processed Material 8