Laserfiche WebLink
6-1 <br /> <br />Forward Composting Facility SWT Engineering <br /> Report of Composting Site Information - July 2014 <br />z:\projects\allied waste\forward\resource recovery facility\5 yr permit rvw 2013-14\rcsi 2014\text\sec 6.doc <br />6.0 POST-OPERATIONAL USE <br />The Compost Facility is designed to operate as a regional composting facility. However, the <br />site is permitted for future WMUs. Compost operations will be discontinued when Forward <br />begins development of this area for refuse disposal or moved to another area of the <br />property. Any change of location will require the RCSI to be amended and submitted to the <br />LEA for review and approval of the document and SWFP, as necessary. <br />