Laserfiche WebLink
i <br />Forward Resource Recovery Facility SWT Engineering <br /> Transfer/Processing Report – July 2014 <br />z:\projects\allied waste\forward\resource recovery facility\5 yr permit rvw 2013-14\tpr 2014\text\toc.doc <br />FORWARD RESOURCE RECOVERY FACILITY <br />TRANSFER/PROCESSING REPORT <br /> <br />TABLE OF CONTENTS <br /> <br />1.0 FACILITY OVERVIEW ........................................................................................................... 1-1 <br /> 1.1 Introduction and Purpose ................................................................................... 1-1 <br /> 1.2 Proposed Changes to Operations ...................................................................... 1-1 <br /> 1.3 Owner/Operator (14 CCR, Section 18221.6 (a) and (o)) ................................. 1-1 <br /> 1.4 Site Location (14 CCR, Section 18221.6 (b)) ................................................... 1-1 <br /> 1.5 Site Plan and Description (14 CCR, Section 18221.6 (c) and (f)) ................... 1-2 <br /> 1.6 Adjacent Land Use (14 CCR, Section 18221.6 (b)) .......................................... 1-2 <br /> 1.7 Area Climate ........................................................................................................ 1-3 <br /> 1.7.1 Temperature ......................................................................................... 1-3 <br /> 1.7.2 Precipitation ......................................................................................... 1-4 <br /> 1.7.3 Floodplain ............................................................................................. 1-4 <br /> 1.7.4 Evaporation .......................................................................................... 1-5 <br /> 1.7.5 Wind ...................................................................................................... 1-5 <br />2.0 TRANSFER STATION INFORMATION .................................................................................. 2-1 <br /> 2.1 Transfer Station Activities (14 CCR, Section 18221.6 (d)) .............................. 2-1 <br /> 2.1.1 Materials Receiving ............................................................................. 2-1 <br /> 2.1.2 Unloading .............................................................................................. 2-1 <br /> 2.1.3 Incoming Materials Storage ................................................................ 2-1 <br /> 2.1.4 Materials Removal ............................................................................... 2-2 <br /> 2.2 Hours of Operation (14 CCR, Section 18221.6 (e)) ......................................... 2-2 <br /> 2.3 Facility Design (14 CCR, Sections 17406.2 and 18221.6 (c) and (g)) ........... 2-2 <br /> 2.3.1 Design Plans (14 CCR, Section 18221.6 (c)) ..................................... 2-3 <br /> 2.3.2 Design Calculations (14 CCR, Section 18221.6 (g)) ......................... 2-3 <br /> 2.4 Final Disposal (14 CCR, Section 18221.6(m)) ................................................. 2-3 <br /> 2.5 Waste Type and Volume (14 CCR, Sections 17407.5 (a) and (c), <br />17408.2, and 18221.6 (h)) ............................................................................... 2-4 <br /> 2.5.1 Waste Types ......................................................................................... 2-4 <br /> 2.5.2 Waste Quantities .................................................................................. 2-4 <br /> 2.6 Equipment (14 CCR, Section 17416.3 and 18221.6 (l)) ................................. 2-4 <br /> 2.6.1 Equipment Maintenance ..................................................................... 2-5 <br /> 2.6.2 Standby Equipment ............................................................................. 2-5