Laserfiche WebLink
('uIlNutid.,h·d I;urward Landfill Project -MItig01l1on M()nil()rinl~ and Itep()rlinl~ Progr01nt ChccktiHt Page 24 <br />Implcmcntation <br />Millgallon Measure Implementation Monitoring Confirmation Comments <br />MITIGATION MONITORING AND REPORTING PROGRAM CHECKLIST <br />INTRODUCTION: <br />This Mitigation Monitoring and Reporting Program Checklist includes mitigation measures identified in this EIR, as weIl as mitigation measures from three <br />previous EIRs prepared for the project site, identified below as "Forward 1993"," Austin 1994", and" Austin 2000". These three previous EIRs are discussed in <br />more detail in the introduction to Attachment I Mitigation Measures, above. <br />Mitigation measures are grouped by the impact categories used in this EIR, and numbered sequentially. <br />Mitigation Measures from this EIR are printed in normal font, with the original Mitigation Measure numbers from this EIR following in (parentheses). Mitigation <br />measures from the three previous EIRs are printed in italics and identified by their source (Forward 1993, Austin 1994, or Austin 2000), followed by the Mitigation <br />Measure number in the relevant EIR. Because some impacts in this EIR and in previous EIRS do not require mitigation measures, the original mitigation measure <br />numbers are not sequential. <br />In some cases, mitigation meaSures from two or more of the previous EIRq that nrc substantially similar in content, or have been updated without otherwise being <br />changed, have been combined. These mitigation measures are identified as "similar" andlor "updated". Mitigation measures from the three previous EIRs that <br />have been replaced by equivalent measures in this EIR, or have already been implemented, are excluded from the list below. <br />A. LAND USE, PLANS, <br />AND POLICIES <br />1 (A.3) Bird J Jazani, <br />(:oulil1l1e exislillg <br />bird ct>ntroll11e~stll'cs <br />Limit surface of ponds <br />Bird survey <br />/""' <br />f <br />Respunsibility: Landfill operator <br />'I'illling: Ongoing <br />Responsibility: Landfill operator <br />Timing: The area of proposed and <br />existing ponds shaIl be shown on any <br />grading pennits submitted to the <br />County <br />Responsibility: Landfill operator <br />Timing:. Upon approval ofUso Permit <br />and prior to approval of . business license <br />Responsihility: Still Jonquin County <br />Environmcntal J Icalth Department <br />Timing: Durillg monthly site visits <br />Responsibility: RWQCB <br />Timing: Prior to approval of Waste <br />Discharge Requirements (WDRs) <br />Responsihility: S,an Joaquin County <br />Euvil'Olll1lCntalllealtll Dcpartlllcnt <br />'Timing: Prior to approval of <br />business liccnse <br />,,_ .. , .......