Laserfiche WebLink
Consolidated Forward Landfill Project -Mitigation Monitoring and Reporting Program Checklist Page 26 <br />Mitigation Measure <br />Shield lighting <br />Additional fo'AA or <br />Airp()rt rcqtlifCI11cnts <br />Implementation <br />Timing: Prior to approval of <br />business license <br />Responsibility: Landfill operator <br />Timing: Shielding oflighting shall <br />be shown on Improvement Plan <br />Responsibility: Landfill operator <br />Tinting: When required by FAA or <br />Airport <br />B. TRANSPORTATION AND <br />CIRCULATION <br />3 (B. I ) Signals at Austin! <br />Mariposa Roads <br />4 (D.2) Signals at Austin/ <br />Arch "nd Austin/ <br />French Camp Roads <br />5 (B.6) AustinIMariposa <br />tum lane <br />C.NOISE <br />6 (C.3) Limit nighttime <br />equipment operation; <br />Noise berm . <br />r-. , , <br />------------------ <br />Responsibility: Landfill operator <br />Timing: Prior to approval of <br />business license <br />Responsibility: Landfill operator <br />Timing: Prior 10 approval of <br />business license <br />Responsibility: Landfill operator <br />Timing: Prior to approval of <br />business license <br />Responsibility: Landfill operator <br />Timing: The Improvement Plan shall <br />indicate if IlIghttime operations will <br />occur within 1500 feet or residences <br />and, if so, identitY the location <br />and dimensions of the berm <br />Monitoring <br />Management Board <br />Timing: Prior to approval of <br />business license <br />Responsibility: Stockton Metropolitan <br />Airport <br />Timing: Prior to approval of Improvement <br />Plan <br />Responsibility: FAA and/or Stockton <br />Metropolitan Airport <br />Timing: As determined by FAA or <br />Airport <br />Responsibility: San Joaquin County <br />Public Works Department <br />Timing: Prior to approval of <br />business license <br />Responsibility: San Joaquin Counly <br />Public Works ))ol'lIrllllenl <br />Timing: Prior 10 approval of <br />business license <br />Responsibility: San Joaquin County <br />Public Works Department <br />Timing: Prior to approval of <br />business license <br />Responsibilily: San Joaquin County <br />Community Development Department <br />Timing: Plior to approval of the Improvement <br />Plan and 011 a complaint basis <br />r--- <br />Implementation <br />Confirmation Comments <br />--:--,