My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2018-2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2018-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 4:27:38 PM
Creation date
12/20/2021 12:36:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2018-2019
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />C. The Engineer will be in charge of scheduling well installation inspections with <br />EHD. Contractor shall not coordinate any inspections with the EHD unless <br />authorized by the Engineer. <br />D. EHD inspection hours are from 9.00 a.m. to 4.00 p.m. each working day. Well <br />installation shall be during EHD's inspection hours. <br />E. Contractor shall provide the Engineer the estimated day and time for well <br />installation. <br />1. Contractor shall confirm with the Engineer the approximate time Contractor's <br />crew will be ready for the first inspection for a project before 24 hours. <br />2. Contractor shall confirm consecutive inspections needed for the project with the <br />Engineer in the field based on the work progress after the first inspection. The <br />Engineer will then schedule inspections with EHD inspector. <br />2.01 GENERAL <br />All materials shall be new and free of defects. Contractor shall inspect materials <br />before installing. Contractor shall replace defective materials at no additional <br />cost to the County. <br />2.02 WELL CASING <br />The well casing shall be schedule 80, flush -threaded polyvinylchloride (PVC). <br />2.03 WELL SCREEN <br />The well screen shall be PVC schedule 80, flush -threaded. Well screen shall be <br />factory -cut slots. <br />2.04 SAND PACK <br />The sand pack shall be free of debris or organic impurities. <br />2.05 BENTONITE <br />The bentonite seal shall consist of sodium montmorillonite clay, be pellets or <br />chips and should be able to pass through standing water of 50 ft without sticking <br />together or bridging. <br />FH -Groundwater Monitoring <br />Well Specifications 8/15/18 Page 2 of 12 San Joaquin County Public Works Dept <br />Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.