My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2018-2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2018-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 4:27:38 PM
Creation date
12/20/2021 12:36:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2018-2019
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. Contractor shall hydrate the bentonite seal after placement with five (5) gallons of <br />distilled or Engineer -approved water for each 2.5 vertical feet of seal. <br />15. Contractor shall allow the bentonite to hydrate according to manufacturer's <br />specification or according to a field test demonstrating the time required for <br />bentonite to hydrate. <br />16.Contractor shall pump neat cement through a tremie pipe filling the annular <br />space from the top of the bentonite seal upward. The bottom of the tremie pipe <br />shall be maintained below the top of the cement to prevent free fall and bridging. <br />17. Contractor shall try not to disturb the bentonite seal. <br />18. Contractor shall place neat cement in a single pour for wells up to 100 feet deep. <br />For wells deeper than 100 feet, the Contractor shall pour neat cement in two <br />pours, the second pour being at least 12 hours after the first pour. <br />19. Contractor shall pump neat cement with trimie pipe and continuously pull pipe to <br />maintain 5 ft off set from the grout. <br />20. Contractor shall place neat cement in the boring up to the existing grade. <br />Contractor shall allow neat cement to settle overnight. After neat cement <br />settlement, Contractor shall place additional neat cement to a level as indicated <br />in the construction figures. <br />21. Contractor shall install the well enclosure and do the surface completion only <br />after the neat cement has hardened. <br />E. Contractor shall record the following information on the Driller's Log: <br />1. Depth to water -bearing zones <br />2. Total depth of bore hole <br />3. Depth from ground surface to top and bottom of the well screen interval <br />4. Depth from ground surface to top of the sand pack interval <br />5. Depth from ground surface to top of the bentonite plug <br />6. Height above the ground surface of the top of the well casing <br />7. Height above the ground surface of the top of the steel protective casing. <br />3.02 SURFACE COMPLETION <br />A. Contractor shall clean well enclosure housing with high-pressure hot water/steam <br />prior to installation to ensure that it is free of contamination. <br />B. Contractor shall install well enclosure plumb. <br />C. Contractor shall cut the well casing pipe to minimum required height. The well <br />enclosure lid shall open and close smoothly providing space for pump discharge <br />tubing and pump lead wires. <br />FH -Groundwater Monitoring <br />Well Specifications 8/15/18 Page 7 of 12 San Joaquin County Public Works Dept <br />Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.