My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2018-2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2018-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 4:27:38 PM
Creation date
12/20/2021 12:36:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2018-2019
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Taj Bahadori <br />Page 3 of 8 <br />August 30, 2018 <br />Well Installation Schedule —MW -4A will be installed during the fourth quarter of 2018. <br />The drilling and installation of the well may take six (6) or more working days due to its <br />considerable depth. <br />Well Installation — MW -4A will be drilled and developed by a licensed C-57 Contractor. <br />The bore hole will be logged following visual -manual methods described in ASTM D2488 <br />and under the supervision of a California -registered professional geologist or civil engineer. <br />Drilling spoils will be stockpiled near the boring and dispersed near the vicinity of the boring <br />after well installation. <br />The well detail is provided in Figure 2. The well casing will be 2.5 -inch diameter schedule <br />80, flush -threaded polyvinylchloride (PVC). The well screen will be 20 ft. in length; 2.5 -inch <br />diameter PVC schedule 80, flush -threaded with 0.02 -inch factory cut slots. The upper 10 <br />feet of the well casing will be reduced to 2 -inch diameter PVC. Centralizers will be used to <br />center the well casing in the bore hole and will be composed of plastic or stainless steel. The <br />sand pack will be #2/12 size, placed in the annulus between the well screen and the boring, <br />and brought to at least two feet above the top of the well screen. A bentonite seal will consist <br />of sodium montmorillonite clay. The bentonite seal will be at least two feet in vertical <br />thickness and will be placed above the sand pack prior to grouting the remaining well <br />annulus. The neat cement well seal will be placed above the bentonite seal, and will consist <br />of Portland Type II cement and having a bentonite mixture of 5 percent by weight. Because <br />of the considerable depth of the well, the cement seal will be placed in at least two lifts. <br />Well Development - The drilling contractor will allow a minimum 48 hours for the neat <br />cement seal to set. The contractor will develop the well within 7 days of completion of the <br />well. The contractor will develop the well using mechanical surging or over pumping, or a <br />combination thereof. Development of the well will continue until: <br />• Well water is clear to the unaided eye <br />• Sediment in the well casing is less than 0.1 foot thick <br />• Water removed during surging and purging will be a minimum of three times the <br />water volume in the well prior to the start of purging plus three times the volume of <br />water added (if any needed) for purging and surging <br />• Temperature is consistent within 0.2 degrees Celsius <br />• Specific conductivity is within 10 percent change <br />• pH varies less than 0.2 pH units <br />• Turbidity varies not more than 10% <br />Well Installation Report - A well installation report for well MW -4A, including the <br />analytical results of first monitoring event, will be included with the Second Semiannual and <br />Annual 2018 Monitoring Report. Boring log, well completion details, and survey data will <br />be uploaded to GeoTracker. The well installation report will include the items listed in the <br />083018 FH-RWQCB-Revised Work Plan_Final.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.