Laserfiche WebLink
L� <br />Natalia Subbotnikova [EH] <br />From: Robert McClellon [EH] <br />Sent: Thursday, May 10, 2018 9:42 AM <br />To: Natalia Subbotnikova [EH] <br />Subject: FW: Foothill Sanitary Landfill - Engineered Alternative Design LCRS <br />Attachments: 2018-05-10 FH EAD LCRS Letter.docx.pdf <br />Natalia, please print and place in the file. Robert <br />From: Bahadori, Taj [mailto:tbahadori@sjgov.org] <br />Sent: Thursday, May 10, 2018 9:36 AM <br />To: 'Moody, John' <br />Cc: Chandra, Joyesh; Acevedo, Juan; 'Russell, Jake'; Reno, Desi; Stone, Jim; Robert McClellon [EH]; <br />'CentralValleySacramento@waterboards.ca.gov'; Bahadori, Taj <br />Subject: Foothill Sanitary Landfill - Engineered Alternative Design LCRS <br />John; <br />Following up to our phone discussion of May 8, 2018, attached is the Engineered Alternative Design Report for the LCRS <br />system of Module 2B at Foothill Sanitary Landfill. The County is proposing to use Geocomposite Drainage Net (GDN) as <br />an alternative to the Gravel Drainage Layer (GDL) in the base and slopes of Module 2B. Once this report is reviewed and <br />accepted, the County will submit the full Design Report for the construction of Module 2B. The file has been uploaded to <br />Geotracker (9114376962). Please call if you have any questions. <br />Thank You <br />Taj Bahadori, PE <br />Senior Engineer <br />209-953-7316 <br />