Laserfiche WebLink
1 6 <br /> \� J <br /> • Taj M. Bahadori -3- 25 January 2019 <br /> Foothill Landfill <br /> Stockton <br /> Given that the Discharger is not proposing any changes to the liner itself, nor to the LCRS sumps, <br /> the proposed LCRS design should be at least as protective of water quality as that prescribed in <br /> the WDRs (Factor 3 above). Slope stability and other module-specific engineering issues <br /> associated with the proposed liner design modification, including any necessary modifications to <br /> the above analysis or water quality issues associated with the design, will, however, need to be <br /> addressed in individual design reports for modules (or module phases) as they are proposed. <br /> Based on Water Board staff's review of the Liner EAD Report, and the information and professional <br /> certification therein, the Liner EAD Report and proposed EAD modification therein is approved. <br /> Please note that approval to build this LCRS design on any given module, including Module 2B <br /> and future LF-2 modules, will require Water Board staffs review and approval of the individual <br /> design reports for those modules/phases, as they are submitted. <br /> If you have any questions, please contact John Moody by telephone at (916) 464-4641 or by email <br /> at john. oo yO) at r o r s.c . ov. <br /> Patrick Pulupa <br /> Executive Officer <br /> Enclosure <br /> cc: Alyssa Gagnon, Permitting & LEA Support, CalRecycle, Sacramento <br /> Robert McClellon, San Joaquin County Environmental Health Department, <br /> Stockton <br /> Jake Russell, Geo-Logic Associates, Grass Valley <br />