Laserfiche WebLink
Foothill Sanitary Landfill 31 May 2018 <br /> Photo 1: LFG extraction well installed through Photo 2: Looking southeast across top deck of <br /> Evapotranspiration (ET)Cover of Module I. Eight Module I ET cover. The ET cover has a robust <br /> new LFG extraction wells have been installed to vegetative cover with no signs of erosion. <br /> bring the total to 17 LFG extraction wells. <br /> 0 <br /> r <br /> Photo 3: Looking east across Module I. Photo 4: Looking northwest across side slope of <br /> Module I. Open land in background is within <br /> landfill boundary. <br />