Laserfiche WebLink
m <br />11 <br />n <br />Second Q2018 <br />Structure Monitoring Landfill Gas Results <br />Foothill• <br />Building • Monitoring Location• <br />arbon <br />•- <br />Oxygen <br />Balance <br />Building (Electrical Conduit) <br />1 <br />1 <br />• <br />• <br />- • <br />IRA W -I 1:101*01 mn,Manager's <br />����� <br />�'i-� <br />��1�� <br />���1. <br />Residence (Electrical) <br />!Manager's Residence •_. __.. <br />1' 1!: <br />I). • <br />•.. <br />'Scalehouse (Electrical Conduit) <br />;,Scalehouse (Interior) <br />■ <br />Monitoring Date: June 25, 2018 <br />N:\1 Foothill\LFG Migration Monitoring\2018\2nd Qtr\6-25-18FH-Structures <br />Monitoring Technician: M. Calmes <br />