Laserfiche WebLink
IMPROVEMENT PLAN SUBMITTAL CHECKLIST <br /> A. The following items must be submitted to the Public Works <br /> Department before the Improvement Plans can be checked : <br /> 1 . Preliminary Engineer ' s Estimate <br /> 2 . Plan Checking Fee based on Preliminary Engineer ' s <br /> Estimate : <br /> a. 5 . 5% first $ 25 ,000.00 <br /> b. plus 3% next $ 225,000. 00 <br /> C. plus 1 .75% over $ 250,000.00 <br /> 3 . 3 - complete sets of Improvement Plans <br /> 4 . 3 - sets of Specifications <br /> S . 1 - complete set of Preliminary Soils Report including <br /> R - Values and structural sections calculations. <br /> 6 . Storm drain calculations ( Hydrology , sub-area map, pipe <br /> line, hydraulic design, ponding basin, pump system,etc. , <br /> if applicable ) <br /> 7 . Water and sewer design data and supporting calculations <br /> if applicable . <br /> B. 1 - Draft Final Map <br /> B. The Subdivision Review Checklist is attached. <br />