My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
BILLING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 4:30:45 PM
Creation date
12/29/2021 8:27:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306046
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A NJO A QU I Environmental Health Department <br /> N i Y Jasjit Kang, REHS, Director <br /> SAN JOAQUIN COUNTY CERTIFIED UNIFIED PROGRAM AGENCY <br /> PERMIT TO OPERATE <br /> This permit is valid for Permit Status identified as "IN COMPLIANCE" <br /> Program <br /> Record ID Program Code and Description <br /> PR0232495 2300-UNDERGROUND STORAGE TANK FACILITY <br /> Underground Storage Tank Program: <br /> California Health and Safety Code,Div.20,Chap.6.7 and Title 23,California Code of Regulations,Chap.16. <br /> ....... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... <br /> P/E Tank# CERS Tank ID Permit# Capacity Contents Permit Status System Type Leak Detection Pennit Valid <br /> 2360 1 10181485-001 PT0005190 10,000 OTHER IN COMPLIANCE DOUBLE-WALL Continuous Monitoring 1/1/2023 To 12/31/2023 <br /> 2360 2 10181485-002 PT0005191 1,000 USED OIL IN COMPLIANCE DOUBLE-WALL Continuous Monitoring 1/1/2023 To 12/31/2023 <br /> 2360 3 10181485-006 PT0005192 10,000 OTHER PETROLEUM IN COMPLIANCE DOUBLE-WALL Continuous Monitoring 1/1/2023 To 12/31/2023 <br /> 2360 4 10181485-003 PT0005193 6,000 USED OIL IN COMPLIANCE DOUBLE-WALL Continuous Monitoring 1/1/2023 To 12/31/2023 <br /> 2360 5 10181485-005 PT0005194 6,000 OTHER PETROLEUM IN COMPLIANCE DOUBLE-WALL Continuous Monitoring 1/1/2023 To 12/31/2023 <br /> 2360 6 10181485-004 PT0005195 6,000 OTHER IN COMPLIANCE DOUBLE-WALL Continuous Monitoring 1/1/2023 To 12/31/2023 <br /> 2360 7 10181485-007 PT0005196 4,000 OTHER PETROLEUM IN COMPLIANCE DOUBLE-WALL Continuous Monitoring 1/1/2023 To 12/31/2023 <br /> _(BOEJID#: 44020726 m <br /> Underground Storage Tank Permit Conditions <br /> 1) The Permit to Operate will become void if Annual Permit Fees and Service Fees are not paid and/or the UST system(s)fails to remain in compliance with these Permit Conditions. <br /> 2) In order to maintain the operating permit,the owner and operator shall comply with the California Code of Regulations(CCR)Title 23,sections 2610-2717.7;and California Health&Safety <br /> Code,sections 25280-25296 and 25298-25299.6. <br /> 3) If the Tank Operator(s)is different from the Tank Owner,or if the Permit to Operate is issued to a person other than the owner or operator of the tank,the Permittee shall ensure that both <br /> the Tank Owner and tank Operator receive a copy of the permit. <br /> 4) Written Monitoring Procedures and an Emergency Response Plan must be approved by the Environmental Health Department(EHD)and are considererd UST Permit Conditions. The approved <br /> monitoring,response,and plot plans shall be maintained onsite with the permit. <br /> 5) The Permittee shall comply with the monitoring procedures referenced in this permit. <br /> 6) The Permittee shall perform testing and preventive maintenance on all leak detection monitoring equipment annually,or more frequently if specified by the equipment manufacturer,and <br /> provide documentation of such servicing to this office. <br /> 7) In the event of a spill,leak,or other unauthorized release,the Permitee shall comply with the requirements of Title 23 CCR,Chap.16,Art.5,and the approved Emergency Response Plan. <br /> 8) Written records of all monitoring perforated shall be maintained on-site by the operator and be available for inspection for a period of at least thirty-six(36)months from the date the <br /> monitoring was performed. <br /> 9) The EHD shall be notified of any change in ownership or operation of the UST system within 30 days of such change. <br /> 10) The UST owner or operator shall notify the EHD at least 30 days before changing the substance currently stored in the underground storage tank. <br /> 11) Upon any change in equipment,design or operation of the UST system(including change in tank contents or usage),the Permit to Operate will be subject to review,modification or <br /> revocation. <br /> 12) Construction,repair and/or removal permits are required from the EHD prior to any change,repair or removal of UST system equipment. <br /> 13) This Permit to Operate shall not be considered permission to violate any laws,ordinances or statutes of any other Federal,State or Local agency. <br /> .................................................. ................................................ <br /> PERMITS TO OPERATE may be SUSPENDED or REVOKED for cause. <br /> PERMIT(s)Valid only for: YRC INC <br /> Tank Owner: YRC FREIGHT <br /> CERSID 10181485 <br /> Regulated Facility: YRC INC Facility ID FA0003854 <br /> 1535 E PESCADERO AVE Account ID AR0007685 <br /> TRACY CA 95304 Issued 12/29/2022 <br /> Billing Address: YRC INC DBA YRC FREIGHT <br /> YRC INC <br /> 11500 OUTLOOK STREET, SUITE 400 <br /> OVERLAND PARK KS 66211-1213 <br /> 7124.rpt <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209-468-3420 F 209464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.