Laserfiche WebLink
Environmental equivalence - Conditionally allow deviations from specific sections and requirements with <br />equivalent/alternative means [112.7(a)(2)] <br />Facility description and diagram [112.7(a)(3)] <br />Type of oil and storage capacity of each container [112.7(a)(3)(i)] <br />Discharge prevention measures including procedures for routine handling of oil [112.7(a)(3)(ii)] <br />Discharge/drainage controls including secondary containment and discharge control procedures <br />[112.7(a)(3)(iii)] <br />Countermeasures for discharge discover, response, and cleanup [112.7(a)(3)(vi)] <br />Disposal methods for recovered materials [112.7(a)(3)(v)] <br />Emergency response/notification contact list and phone numbers [112.7(a)(3)(vi)] <br />Information and procedures for discharge reporting [112.7(a)(4)] <br />Organization of discharge procedures in SPCC Plan so readily useable in an emergency [112.7(a)(5)] <br />Spill predictions and associated equipment failure descriptions (discharge direction, rate of flow, quantity of oil, <br />etc.) [112.7(b)] <br />Requirements and standards for containment and/or diversionary structures; general containment for most <br />likely release/discharge; examples of containment/diversionary structures [112.7(c)] <br />Impracticability determination - Explanation and alternate requirements for secondary containment [112.7(d)] <br />Inspections/tests procedures and records requirements [112.7(e)] <br />Personnel training and discharge prevention briefings [112.7(f)] <br />Facility security [112.7(g)] <br />Facility tank car and tank truck loading/unloading rack requirements [112.7(h)] <br />Brittle fracture evaluation after repair, alteration, reconstruction, or change in service for field -erected tanks <br />[112.7(i)] <br />Discussion requirements for conformance to applicable requirements and other more stringent federal, state, <br />or local requirements [112.70)] <br />Conditional alternative requirements for general secondary containment for qualified oil -filled operational <br />equipment [112.7(k)] <br />Section 112.8 - SPCC Plan requirements for onshore facilities (Applicable sections) <br />Requirement to meet the 112.7 general requirements and the 112.8 specific discharge prevention and <br />containment requirements [112.8(a)] <br />Facility drainage restrictions, required procedures, and methods [112.8(b)(1) -(5)] <br />Bulk storage container compatibility with stored materials and conditions [112.8(c)(1)] <br />Requirements and standards for sized secondary containment for bulk storage containers and tanks (100910 <br />capacity plus precipitation freeboard) [112.8(c)(2)] <br />Requirements for and limitations on drainage of uncontaminated rainwater from diked areas [112.8(c)(3)] <br />Corrosion protection requirements for buried or partially buried/bunkered metallic storage tanks <br />[112.8(c)(4)&(5)] <br />Specific requirements and examples of regular or periodic integrity testing or inspection of each tank or <br />container; determination of methods and qualifications in accordance with industry standards; test/inspection <br />recordkeeping, including comparison records [112.8(c)(6)] <br />Controlling leaks from/through internal heating coils [112.8(c)(7)] <br />Engineer/update container installation in accordance with good engineering practice; specific allowable and <br />required methods for overfill prevention and testing of liquid level sensing devices 112.8(c)(8)] <br />Effluent treatment facility observation requirement [112.8(c)(9)] <br />Prompt correction of visible discharges from containers and components; removal of accumulations of oil in <br />diked areas [112.8(c)(10)] <br />