My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
BILLING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 4:07:56 PM
Creation date
12/30/2021 9:12:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
ARCO 07147
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN.JOAKIN Environmental Health Department <br /> iC_ Q U N T Y Jasjit Kang, REHS, Director <br /> SAN JOAQUIN COUNTY CERTIFIED UNIFIED PROGRAM AGENCY <br /> PERMIT TO OPERATE <br /> This permit is valid for Permit Status identified as "IN COMPLIANCE" <br /> Program <br /> Record ID Program Code and Description <br /> PR0231175 2300-UNDERGROUND STORAGE TANK FACILITY <br /> Underground Storage Tank Program: <br /> California Health and Safety Code,Div.20,Chap.6.7 and Title 23,California Code of Regulations,Chap.16. <br /> .......................................................................................................... ...................... ............................................................................................................................................................................................................................................................................................................... <br /> P/E Tank# CERS Tank ID Permit# Capacity Contents Permit Status System Type Leak Detection Permit Valid <br /> 2360 6 10180733-001 PT0005522 10,000 REGULAR UNLEADED IN COMPLIANCE DOUBLE-WALL Continuous Monitoring 1/1/2024 To 12/31/2024 <br /> 2360 7 10180733-002 PT0005523 10,000 DIESEL IN COMPLIANCE DOUBLE-WALL Continuous Monitoring 1/1/2024 To 12/31/2024 <br /> 2360 8 10180733-003 PT0005524 10,000 PREMIUM UNLEADED IN COMPLIANCE DOUBLE-WALL Continuous Monitoring 1/1/2024 To 12/31/2024 <br /> CDTFA(BOE)ID#: 228240256_ <br /> Underground Storage Tank Permit Conditions <br /> 1) The Permit to Operate will become void if Annual Permit Fees and Service Fees are not paid and/or the UST system(s)fails to remain in compliance with these Permit Conditions. <br /> 2) In order to maintain the operating permit,the owner and operator shall comply with the California Code of Regulations(CCR)Title 23,sections 2610-2717.7;and California Health&Safety <br /> Code,sections 25280-25296 and 25298-25299.6. <br /> 3) If the Tank Operator(s)is different from the Tank Owner,or if the Permit to Operate is issued to a person other than the owner or operator of the tank,the Permittee shall ensure that both <br /> the Tank Owner and tank Operator receive a copy of the permit. <br /> 4) Written Monitoring Procedures and an Emergency Response Plan must be approved by the Environmental Health Department(EHD)and are considererd UST Permit Conditions. The approved <br /> monitoring,response,and plot plans shall be maintained onsite with the permit. <br /> 5) The Permittee shall comply with the monitoring procedures referenced in this permit. <br /> 6) The Permittee shall perform testing and preventive maintenance on all leak detection monitoring equipment annually,or more frequently if specified by the equipment manufacturer,and <br /> provide documentation of such servicing to this office. <br /> 7) In the event of a spill,leak,or other unauthorized release,the Permitee shall comply with the requirements of Title 23 CCR,Chap.16,Art.5,and the approved Emergency Response Plan. <br /> 8) Written records of all monitoring performed shall be maintained on-site by the operator and be available for inspection for a period of at least thirty-six(36)months from the date the <br /> monitoring was performed. <br /> 9) The EHD shall be notified of any change in ownership or operation of the UST system within 30 days of such change. <br /> 10) The UST owner or operator shall notify the EHD at least 30 days before changing the substance currently stored in the underground storage tank. <br /> 11) Upon any change in equipment,design or operation of the UST system(including change in tank contents or usage),the Permit to Operate will be subject to review,modification or <br /> revocation. <br /> 12) Construction,repair and/or removal permits are required from the EHD prior to any change,repair or removal of UST system equipment. <br /> 13) This Permit to Operate shall not be considered permission to violate any laws,ordinances or statutes of any other Federal,State or Local agency. <br /> PERMITS TO OPERATE may be SUSPENDED or REVOKED for cause. <br /> PERMIT(s)Valid only for: BP PRODUCTS NORTH AMERICA INC <br /> DBA: ARCO#7147 <br /> Tank Owner: BP WESTCOAST PRODUCTS LLC <br /> CERSID 10180733 <br /> Regulated Facility: ARCO 07147 Facility ID FA0001247 <br /> 1206 E MARCH LN Account ID AR0003505 <br /> STOCKTON CA 95210 Issued 12/13/2023 <br /> Billing Address: <br /> BP PRODUCTS NORTH AMERICA INC <br /> PO BOX 6038 <br /> ARTESIA CA 90702 <br /> 7124.rpt <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209-468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.