Laserfiche WebLink
Notes Regarding Comments to <br />Review of <br />Foothill Landfill Joint Technical Document <br />(Items Reference Environmental Health Department's Letter <br />Dated September 15, 2005) <br />1. Application for Permit Review, Part 3, Section B, 3, a, "Average Daily Tonnage (TPD)": The number <br />reported, 790 TPD, reflects the 2004 average tonnage. Instead, report the estimated average waste tonnage <br />expected to be received for each operating day on a yearly basis (calendar year) for the next five years. Do not <br />use non-operating days in calculating the average daily tonnage. <br />This number was revised per this comment and subsequent conversation. <br />2. Application for Permit Review, Part 3, and Section B, 3, b, "Site Capacity Currently Permitted": The <br />number reported, 97.0 million cu yards, is different from the current permit and the JTD value of 102 million <br />cu yards. <br />The number is corrected in this submittal <br />3. Application for Permit Review, Part 3, Section B, 3, c, "Site Capacity Proposed": Use this number to <br />increase site capacity from the currently permitted value. The number reported, 97.0 million cu yards, is the <br />"Site Capacity Currently Permitted" value. If the site capacity is not increasing then this value should be zero. <br />This correction has been made. <br />4. Application for Permit Review, Part 3, Section B, 3, d, "Site Capacity Used to Date": The number reported, <br />10.1 million cu yards, is different from the value reported in Appendix M of the JTD, 10.6 million cu yards. <br />Explain the discrepancy. <br />Please see revised volumes. Please note that the volume calculations in the JTD <br />reflect conditions as of August 2004, the most recent aerial photo -topography. The <br />volumes shown in the Application for Permit Review reflect volumes as of June 2005 in <br />accordance with the instructions for this permit application (See Item 5, below). <br />5. Application for Permit Review, Part 3, Section B, 3, f, "Date of Capacity Information": The date reported is <br />December, 2004. This date can predate the application date by no more than three months. Bring the capacity <br />information up-to-date to within three months of the application date. <br />This correction has been made. <br />6. Application for Permit Review, Part 3, Section B, 3, j, "Site Capacity Planned": Use this number to report <br />any future site expansions not currently being proposed but which may be in the planning stages. The number <br />reported, 97.0 million cu yards, is the "Site Capacity Currently Permitted" value. If there are no planned <br />expansions then this value should be zero. <br />This correction has been made. . <br />Application for Permit Review, Part 5, Section A: Report the Negative Declaration document prepared on <br />3/29/95. <br />This correction has been made. <br />8. Application for Permit Review, Part 6, Section A: Include the JTD with the date prepared. <br />The JTD has been included. <br />9. Application for Permit Review, Part 6, Section B: Include the date prepared for all documents. <br />This date has been included. <br />11 <br />