Laserfiche WebLink
Foothill Sanitary Landfill Inc. <br />Winterization Plan - Winter 2006/07 <br />We v: 11 <br />71-Y-1 MM'4VIIIIII <br />for vehicles to access. <br />This pad is approximately 200 by 250 feet and will be expanded as more suitable <br />materials arrive ( figure I ). <br />Erosion Prevention <br />^b Jflil r1?1%7c';LYRc` =77 IVl <br />implemented on Module 1. <br />The top deck, as well as the side slopes on the North, East, West, and the top part of the' <br />Q-4vtksik.- tkat will x*t receive lixer kave receivet, Aree stq, Mydrtsegfixg ( seed, wull <br />straw, and tackifier ). I <br />A system of berms, d• 11 and ditches lined with anti -erosion mats will direct the <br />flow to the perimeter ditch at the toe of the slopes and to the sedimentation pond on the <br />Eastside, (drawings attached ). <br />On Module 1, the South and Westsides of the new lift have received intermediate cover <br />with native vegetation. <br />Leachate Control <br />]:1, pill 11 ill! 11111; Ill III,[$) I-#) I 4111".kl <br />M=_1 <br />The drainage for Module I has been described as part of the Site hnprovement Project. <br />As for drainage from Module 1, this will be changing as the current lift progresses, <br />continuing to slope primarily to the Southeast where downcomers will be installed to <br />drain into the sedimentation basin to the Southwest of the leach ate tank. <br />