Laserfiche WebLink
Section <br />CERTIFICATION <br />Page <br />1.0 INTRODUCTION.............................................................................................1 <br />Purpose...............................................................................................................1 <br />2.0 EXISTING SITE CONDITIONS...........................................................................2 <br />2.1 Landfill Description..................................................................................... 2 <br />2_2 NSPS Compliance........................................................................................ 2 <br />3_0 PROCEDURE FOR ESTABLISHING LFG COLLECTION REQUIREMENTS...............3 <br />3_1 Prediction of LFG Generation....................................................................... 3 <br />3.2 LFG Extraction & Collection......................................................................... 3 <br />3.2.1 V-ertical Wells............................................................................... 3 <br />3.2.2 Horizontal Wells..........................................................................4 <br />*�m s. „ .... 4 <br />................................................................................ 4 <br />3.2.5 Lateral Pipes................................................................................ 4 <br />3.2.6 Condensate Water Handling......................................................... 5 <br />3.2.7 Flare Station................................................................................ 5 <br />4_0 COMPLIANCE REVIEW AND EVALUATION........................................................6 <br />4.1 <br />Compliance with 660.759(a)(1)...................................................................... 6 <br />4.1.1 <br />Control of Surface Emissions....................................................... <br />6 <br />4.1.2 <br />Depth of Refuse........................................................................... <br />6 <br />4.1.3 <br />Landfill Gas Collection Rate ......................................................... <br />6 <br />4.1.4 <br />Landfill Cover Properties............................................................. <br />7 <br />4.1.5 <br />Landfill Gas Control System Expandability ................................... <br />7 <br />4.1.6 <br />Condensate Management.............................................................7 <br />4.1.7 <br />Accessibility................................................................................7 <br />4.1.8 <br />Compatibility with Refuse Filling Operations ................................ <br />7 <br />4.1.9 <br />Integration with Closure End Use ................................................. <br />8 <br />4.1.10 <br />Air Intrusion Control.................................................................... <br />8 <br />4.1.11 <br />Corrosion Resistance.................................................................. <br />8 <br />4.1.12 <br />Fill Settlement..............................................................................9 <br />4.1.13 <br />Resistance to Refuse Decomposition Heat ................................... <br />9 <br />4.2 <br />Compliance with 660.759(a)(2)...................................................................... <br />9 <br />4.3 <br />Compliance with §60.759(a)(3)....................................................................10 <br />4.3.1 <br />Asbestos and Non -degradable Materials.....................................10 <br />4.3.2 <br />Nonproductive Areas................................................................. <br />11 <br />4.4 <br />Compliance with 660.759(b)(1), (2),&(3)......................................................11 <br />4.4.1 <br />Landfill Gas Extraction Component Construction .......................11 <br />4.4.1.1 Materials........................................................................ <br />12 <br />4.4.1.2 Component Sizing............................................................ <br />12 <br />4.4.1.3 Component Loadina......................................................... <br />12 <br />4.4.1.4 System Expansion............................................................ <br />12 <br />4.4.1.5 Component Perforation..................................................... <br />12 <br />4.4.1.6 Air infiltration................................................................. <br />13 <br />Foothiil Sanitary landfill i Public Works/Solid Waste <br />LFG CS Design Plan County of San Joaquin - March 10, 2005 <br />