Laserfiche WebLink
O.PQUIN'C <br />2. y <br />THOMAS R. FLINN <br />DIRECTOR <br />c4�iFoai+`P <br />THOMAS M. GAU <br />CHIEF DEPUTY DIRECTOR <br />MANUEL SOLORIO <br />DEPUTY DIRECTOR <br />STEVEN WINKLER <br />DEPUTY DIRECTOR <br />11 <br />P. O. BOX 1810 - 1810 E. HAZELTON AVENUE <br />STOCKTON, CALIFORNIA 95201 <br />(209) 468-3000 FAX (209) 468-2999 <br />www.sjgov.org/pubworks <br />ROGER JANES 5 2006 <br />BUSINESS ADMINISTRATOR November 9, 2006 V 1 <br />Ms. Wendy Wyels Env ENT VICES <br />Environmental Program Manager I pERMITiSE <br />California Regional Water Quality Control Board <br />11020 Sun Center Drive, #200 <br />Rancho Cordova, California 95670-6114 <br />SUBJECT: REQUEST FOR ADDITIONAL TIME, FOOTHILL SANITARY LANDFILL SITE <br />IMPROVEMENT PROJECT (CAO No. R5-2004-0706) <br />Dear Ms. Wyels: <br />Please consider this request for additional time on the above referenced project, submitted in <br />accordance with Page 6 for the Cleanup and Abatement Order (CAO). Item No. 8 of the CAO <br />requires that we have "completed construction of all of the components of the Project" by November <br />1, 2006. This due date was revised to December 1, 2006, in a letter from Ms. Molly White. <br />We make this request due to the inability of our contractor (Wood Bros. Construction) to obtain the <br />combustion equipment of the landfill gas system, which is a component of the project. Delay in the <br />delivery of the combustion equipment was apparently due to a back -log in orders, which our <br />contractor could not anticipate. We believe that Wood Bros. has made a good faith effort to obtain <br />the equipment within the time required, the most significant indication of this being the placement of <br />the order for the combustion equipment prior to the start for the construction contract (see <br />correspondence, attached). <br />Because of this delay, we ask that the date for Item No. 8 be extended to February 1, 2007. The <br />combustion equipment will be installed in an area accessible by an all-weather road, and most of the <br />equipment will arrive pre -assembled, so we do not anticipate significant delays due to inclement <br />weather for this work. We anticipate that all other components of the project, including the <br />installation of landfill gas wells and piping, liner, closure of a portion of the landfill, installation of <br />the groundwater wells, improvement of the landfill cover and drainage, will be complete by the <br />December 1, 2006 due date. <br />We do not believe there will be negative environmental impact by this extension. The primary value <br />of a landfill gas collection system to groundwater quality is prevention of contamination by volatile <br />organic compounds (VOCs) carried in landfill gas. We are pleased that contamination by landfill gas <br />VOCs has not been indicated since February 2002, and we suggest that delaying the completion of <br />the landfill gas system will not impact groundwater at our site. <br />