Laserfiche WebLink
rv-;-Iff-�'% <br />C'•, �P <br />4�/FORS <br />THOMAS M. GAU <br />DEPUTY DIRECTOR <br />THOMAS R. FLINN <br />DIRECTOR <br />MANUEL SOLORIO <br />DEPUTY DIRECTOR <br />STEVEN WINKLER <br />DEPUTY DIRECTOR <br />BENTON ANGOVE <br />BUSINESS ADMINISTRATOR <br />Ms. Kim Schwab <br />April 27, 2005 <br />California Regional Water Quality Control Board <br />11020 Sun Center Drive, #200 <br />Rancho Cordova, California 95820-6114 <br />v <br />P. O. BOX 1810 - 1810 E. HAZELTON AVENUE <br />STOCKTON, CALIFORNIA 95201-3018 <br />(209) 468-3000 we <br />4 8-2999 <br />VIP s <br />SUBJECT: REVISION TO PRELIMINARY CLOSURE/POSTCLOSURE MAINTENANCE <br />PLAN, FOOTHILL SANITARY LANDFILL <br />Dear Ms. Schwab: VJA <br />Enclosed, please find Tables 2-3, and 3-1 of the Preliminary Closure and Postclosure <br />Maintenance Plan for Foothill Sanitary Landfill (San Joaquin County, February 1, 2005), revised <br />to reflect refinements to the landfill gas components of closure and postclosure maintenance. <br />These costs are based on the Preferred System shown on Plate C-3 in Appendix C. This revision <br />was prepared in coordination with Kleinfelder, Inc. <br />Please insert these tables as replacement in the Closure Plan 3 -ring binder (the revision date is <br />shown in the footer). The upcoming Financial Assurance submittal will reflect these costs. <br />If you have any questions, please call me at (209) 468-8504. <br />Sincerely, <br />W. MICHAEL CARROLL, PE <br />Senior Civil Engineer <br />WMC:sc <br />NAI Foothill\SiteimpProj061KSchwab08-ClopCostRev.doc <br />Enclosure <br />c: Robert McClellon, Environmental Health Department <br />Tim Crandall, Kleinfelder Inc. <br />LA 10640D <br />