Laserfiche WebLink
kog LEIFEL E <br />An employee owned company <br />June 9, 2005 <br />47717 <br />Ms. Kim Schwab <br />Central Valley Regional Water Quality Control Board <br />11020 Sun Center Drive #200 <br />Rancho Cordova, CA 95670-6114 <br />Re: Response to Comments <br />Partial Cover, Intermediate Cover and Drainage and Erosion Control Plan <br />Foothill Landfill <br />Dear Ms. Schwab: <br />In a letter dated February 22, 2005, you provided review comments on the November 16, <br />2004 document "Partial Cover, Intermediate Cover and Drainage and Erosion Control <br />Plan" (Plan) prepared by Kleinfelder. Enclosed with this letter you will find revision <br />pages (pages ii of the Table of Contents, page 7 and page 11) for this report that address <br />the two comments in your letter. These revision pages include the following changes: <br />• Size and location of demonstration area (Page 7). <br />• Test information on the borrow source soil that will be used for the partial cover <br />(Page 11). <br />• Volume estimates for partial and intermediate cover (Page 11). <br />There are two sets of revision pages. The first set shows the revisions in bold text. The <br />second set has no bolding and is punched for insertion in the Plan. <br />Please Contact me if you have any questions or require additional information. <br />Sincerely, <br />Timothy Crandall, P.E. <br />Senior Engineer <br />Cc: Michael Carroll, San Joaquin County Public Works <br />47717 June 9, 2005 <br />o ght 005 Klei (elder, c. <br />KLEINFEL� 3 77 rl e Circle, Sacramento, CA 95827-1815 (916) 366-1701 (916) 366-7013 fax <br />