Laserfiche WebLink
Mr.W.Michael Carroll <br /> Page 2 of 2 <br /> Specific Comments <br /> 3. Section 2.2: The section pertaining to postclosure maintenance refers to the Preliminary Closure and <br /> Postclosure Maintenance Plan, Foothill Sanitary Landfill(February 2005). Preliminary plans are usually <br /> conceptual in nature and do not provide the level of detail required for a final plan(including a partial final <br /> plan). However,since Board staff has not reviewed the February 2005 Plans(See Comment No.2 above), <br /> staff is unable to determine if more detail is necessary. Please provide the appropriate level of detail for <br /> postclosure maintenance. <br /> Should you have any questions or comments concerning the above matter,please contact Mr.Gino Yekta of my <br /> staff or me at(916)341-6354 or(916)341-6318,respectively. <br /> Sincerely, <br /> Michael B. Wochnick,P.E.,Manager <br /> Closure and Technical Services <br /> cc: Mr.Robert McClellon,San Joaquin County Solid Waste Local Enforcement Agency <br /> Ms.Kim Schwab,Central Valley Regional Water Quality Control Board,Sacramento Office <br /> Mr.Timothy Crandall,Kleinfelder,Inc., Sacramento <br />