My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014565 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FAIROAKS
>
8350
>
2600 - Land Use Program
>
SU-86-12
>
SU0014565 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:46:01 PM
Creation date
1/4/2022 9:32:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014565
PE
2600
FACILITY_NAME
SU-86-12
STREET_NUMBER
8350
Direction
W
STREET_NAME
FAIROAKS
STREET_TYPE
RD
City
TRACY
APN
24813001
ENTERED_DATE
12/8/2021 12:00:00 AM
SITE_LOCATION
8350 W FAIROAKS RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 4.. DUST CONTROL REQUIRED MEASURES <br />I. During clearing, grading, earth moving or excavation: <br />a. Water trucks or sprinkler systems to be used in sufficient <br />quantities to prevent dust raised from leaving the site. <br />b. The entire area of disturbed soil to be wet down, sufficient to <br />create a crust, after each day's activities cease. <br />II. After clearing, grading, earth moving or excavation is completed: <br />a. The entire area of disturbed soil is to be treated to prevent wind <br />pick up of the soil. This may be accomplished by: <br />1. Seeding and watering until grass cover is grown. <br />2. Spreading soil binders. <br />3. Wetting the area down, sufficient to form a crust on the <br />surface with repeated soakings as necessary to maintain the <br />crust and prevent dust pick up by the wind. <br />4. Other methods approved in advance by the Air Pollution Control <br />District. <br />III. During Construction: <br />a. Water trucks or sprinkler systems to be used to keep all areas of <br />vehicle movement damp enough to prevent dust raised from leaving <br />the site. <br />1. As a minimum, this will include wetting down such areas in the <br />late morning and after work is completed for the day. <br />2. Increased watering frequency will be required whenever the wind <br />speed exceeds 15 mph. <br />b. All roadways, driveways, sidewalks, etc., should be paved as soon <br />as possible. In addition, building pads should be laid as soon as <br />possible after grading unless seeding or soil binders are used. <br />IV. Activation of Increased Dust Control Measures: <br />The contract of builder shall designate a person or persons to monitor <br />the dust control program and to order increased watering, as necessary, <br />to prevent transport of dust off site. Their duties shall include <br />holiday and weekend periods when work may not be in progress. The name <br />and telephone number of such persons shall be provided to the Air <br />Pollution Control District. <br />Source: San Francisco Bay Area Air Quality Management District, 1983. <br />13.4-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.