Laserfiche WebLink
11. Please include a copy of any studies ( soils, geology, marketing, <br /> etc. ) that you may have had prepared for this project or project <br /> site. <br /> C. PROJECT CHARACTERISTICS <br /> 1. Services: Indicate how the following services will be provided <br /> for your project and availability of service. <br /> a . Water Supply: 1. ATH R c P SC Ea AI P i S-. R i e T <br /> b. Sewage Disposal : (1in. at?, SSG <br /> C . Storm Drainage: S aii �c:� J C[�:1�1i�� ` <br /> If an extension of any of the above is necessary, indicate <br /> which service( s ) , what agency will be providing the <br /> service( s ) , and the distance of the extension( s ) : <br /> U i'TlFC nl? F r 15 ' N ;74 'Tu THS P�c�E / <br /> d. Natural Gas : PAC.irl Gl) ' `a� � 1 6c_ TPC <br /> e. Electricity: I ,n r) <br /> f . Road/Access ( i .e . , paved, unpaved, public/private, road name ) : <br /> t?n \JGD _ P ' C . A V') N go 0i <br /> g. Fire: Distance to nearest fire station: i c <br /> h . Schools: 13N : %Gn Srwcn- <br /> 2 . Describe any site alterations which result from the proposed pro- <br /> ject ( specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal, alterations to drainage, <br /> removal of existing structures, number of trees removed, etc. ) . <br /> R() NL' <br /> 3. Air Quality Information: <br /> Number and type of vehicles associated with completed project <br /> Ne) NG ( nrj,v P3R1LM'TE ) <br /> Types of emissions and sources associated with project nL-JN (- <br /> Fuel sources (and amounts ) to be consumed by or as a result of the <br /> completed project N O N E <br /> Will the project result in substantial air emissions or deteriora- <br /> tion of ambient air quality? JNO _ YES <br /> 4 . How much agricultural land will be removed from production? <br /> NoNr- <br /> Irrigated Not irrigated <br /> Major Subdivision - 9 - (6/86 ) <br />