My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2003-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2003-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:06:51 AM
Creation date
1/4/2022 2:12:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2003-2004
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
305
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STRATEGY FOR THE SITE IMPROVEMENT PROJECT <br /> MODULE 1 LINER COMPLETION AND OTHER IMPROVEMENTS <br /> FOOTHILL SANITARY LANDFILL <br /> GENERAL <br /> This document identifies the components of the upcoming site improvement project as proposed in <br /> the letter from San Joaquin County dated 16 January 2004. <br /> The Strategy identifies the information to be included in the design of the project, and the schedule <br /> by which the project will be executed. <br /> PROJECT COMPONENTS <br /> The following components will be included in the site improvement project. <br /> Not included as a component of the construction project,but an integral part of the initial work by <br /> the County,will be to engage a consultant to assist the County with the design and other important <br /> aspects. <br /> 1. Extension of Module 1 liner onto Module "I" <br /> The Liner of Module 1 will be extended over the southern side of Module"I" (Figure 1). At this <br /> time, it is anticipated that the design will be according to the WDRs for side slope landfill base liners <br /> now installed in Module 1. This includes a composite liner over prepared subgrade, a geocomposite <br /> drain layer, and a minimum two-foot thick operations soil layer. <br /> The design effort associated with this extension is will include evaluation of. <br /> A. Slope,bench intervals, and any soils placed for cover enhancement. <br /> B. Performance when subject to refuse surcharge and resulting differential settlements, <br /> including consideration of. <br /> • Overfill of side slope liner to final grade <br /> • Depths of existing refuse under side slope liner, and settlement that may be expected. <br /> C. Slope stability,using. <br /> Dr. Abrahamson's Seismic Criteria, 04/13/02, in Appendix F,ROWD. <br /> • Slope stability criteria and methodologies in Appendix F,ROWD. <br /> Existing refuse fill,proposed liner/cover profiles, and refuse overfills. <br /> Foothill Sanitary Landfill-Site Improvement Strategy 1 Department of Public Works/Solid Waste <br /> February 2,2004 County of San Joaquin <br />
The URL can be used to link to this page
Your browser does not support the video tag.