Laserfiche WebLink
CLEANUP AND ABATEANT ORDER NO. R5-2004-0706 5 <br /> COUNTY OF SAN JOAQUIN AND FOOTHILL SANITARY LANDFILL, INC. <br /> CALAVERAS COUNTY <br /> discharge from the Foothill Sanitary Landfill facility, in accordance with the scope and schedule set <br /> forth below.' <br /> 1. By 31 August 2004, the Discharger shall submit a Project Design Report, which shall contain, <br /> but not be limited to, a general description of the proposal to eliminate the release of LFG <br /> from Module "I" (the "Project"), the details of the proposed barrier between Module "I" <br /> (unlined) and Module I (new expansion)refuse, the conceptual LFG collection system for <br /> Module "I," additional groundwater monitoring wells, and intermediate cover for the <br /> sideslopes for all modules in compliance with WDRs and the minimum standards set forth in <br /> Title 27 CCR. <br /> 2. By 21 September 2004, the Discharger shall submit a Landfill Closure Method Selection <br /> Report, which shall include, but not be limited to, the proposed closure method for the crest of <br /> Module "I," including the performance demonstration for alternative covers, in compliance <br /> with WDRs and the minimum standards set forth in Title 27 CCR. <br /> 3. By 16 November 2004, the Discharger shall submit a Partial Cover, Intermediate Cover and <br /> Drainage and Erosion Control Plan for surfaces that have reached final elevations or which <br /> are not at final elevations, but which will not receive refuse within 180 days for intermediate <br /> cover and two years for partial cover as described in the WDRs, in compliance with the <br /> minimum standards set forth in Title 27 CCR. <br /> 4. By 1 February 2005, the Discharger shall submit a Preliminary Closure and Post Closure <br /> Maintenance Plan, which shall include the area(s)to be closed (e.g., crest of Module "I"), <br /> details of the landfill gas collection system and associated cost estimates, and closure/post <br /> closure maintenance cost estimates to determine funding for the financial assurance <br /> mechanism, in compliance with WDRs and the minimum standards set forth in Title 27 CCR. <br /> 5. By 14 June 2005,the Discharger shall submit the Partial Final Closure Plan, which shall <br /> include details of the closure activities for the "crest"of Module "I" as identified in the <br /> approved Preliminary Closure and Post Closure Maintenance Plan, in compliance with <br /> WDRs and the minimum standards set forth in Title 27 CCR. <br /> 6. By 6 September 2005, the Discharger shall submit a Construction Specifications and <br /> Construction Quality Assurance/Quality Control Plan, which shall include,but not be limited <br /> to construction specifications and construction quality assurance/quality control details for <br /> each Component of the Project as follows: <br /> ■ Final closure of the crest of Module "I"; <br /> ■ Partial and intermediate Cover; <br /> ' The schedule is derived from a schedule proposed by the Discharger,which is part of the record for this Order and <br /> includes assumptions regarding timelines for necessary review and approvals by third party agencies.Delays in those <br /> reviews and approvals,to the extent unrelated to acts or omissions by the Discharger,shall constitute good cause for <br /> modification of the schedule in this Order. <br />