Laserfiche WebLink
-+-- 1/4" HOSE x MPT LABCOCK VALVE <br /> --*- TEFLON TAPE ON THREADS <br /> -.-- 3/4" x 1/4" THD RED BUSHING <br /> TEFLON TAPE ON THREADS <br /> 3/4" FPT x SLIP ADAPTOR <br /> DO NOT GLUE <br /> 3/4" SCH 40 PVC PIPE <br /> 00 INSTALL CPLGS AS NEEDED <br /> w SECURE W/ SS SCREWS <br /> D USE NO GLUE <br /> ca <br /> w <br /> w <br /> N <br /> a- <br /> c� <br /> z <br /> Li <br /> J <br /> 3/4" PVC CPLG <br /> DO NOT GLUE <br /> 0 <br /> PERFORATIONS: 1/16" HOLES <br /> MIN 20 PER FT <br /> z <br /> o <br /> N <br /> O <br /> #6 x 3/4" STAINLESS STEEL SCREW (TYP) <br /> •.-- 3/4" PVC CAP <br /> DO NOT GLUE <br /> 1/16" HOLE IN CAP <br /> DO NOT USE GLUE OR SOLVENTS MONITORING WELL INSTALLATION PROJECT <br /> IN THE ASSEMBLY OF THE PROBE <br /> USE STAINLESS STEEL SCREWS TO NOT TO SCALE <br /> SECURE ALL FITINGS <br /> FIGURE 9 <br /> FOOTHILL SANITARY LANDFILL <br /> SOIL GAS PROBE DETAIL <br />