My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2007-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:07:13 AM
Creation date
1/4/2022 2:21:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2007-2009
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />E <br />Table 1 Corrective Action Cost Estimate <br />BASIS <br />Corrective Action Period 30 years <br />Costs estimated in 2008 dollars <br />OPERATION AND MAINTENANCE <br />Item Quantity Unit Price Annual Cost <br />Replacement of non-mechanical items 10% $260,400 $26,040 <br />Staff hours (average) 156 hrs $ 80.00 $12,480 <br />Total Annual Cost $38,520 <br />Annual O&M Cost During Corrective Action Period $1,155,600 <br />TOTAL COST OVER CORRECTIVE ACTION PERIOD $1,677,090 <br />ANNUAL COST $55,903 <br />Note: inflation factor supplied by CIW MB <br />Corrective Action Financial Assurance Cost Estimate 5 September 30, 2008 <br />Foothill Sanitary Landfill Public Works/Solid Waste Div. <br />CONSTRUCTION <br />Item <br />Quantity Unit Price <br />Extended Cost <br />LFG System Enhancement <br />Contractor Mobilization <br />$15,000 <br />Vertical LFG Wells (4 @ 200 ft ea) <br />1400 LF $140 <br />$196,000 <br />Lateral pipe on surface (4 @ 150 ft ea) <br />1050 LF $48.00 <br />$50,400 <br />Well head and connection, including soil <br />gas 7 each $2,000 <br />$14,000 <br />LFG Extraction System Subtotal <br />$260,400 <br />Permits and Inspections <br />RWQCB <br />LS <br />$4,000 <br />Well Drilling Permit Fees <br />LS <br />$550 <br />Inspection Fees <br />8 hr $105 <br />$840 <br />Permits and Inspections Subtotal <br />$5,390 <br />EMP Work Plan and Implementation <br />Professional and Technical Services <br />LS <br />$65,700 <br />Driller, Lab, Surveyor, Utility Clearance <br />LS <br />$133,500 <br />EMP Work Plan and Implementation Subtotal <br />$199,200 <br />Engineering Design <br />Professional and Technical Services <br />LS <br />$51,400 <br />Final Report <br />LS <br />$5,100 <br />Engineering Design Subtotal <br />$56,500 <br />Total Construction Cost <br />$521,490 <br />OPERATION AND MAINTENANCE <br />Item Quantity Unit Price Annual Cost <br />Replacement of non-mechanical items 10% $260,400 $26,040 <br />Staff hours (average) 156 hrs $ 80.00 $12,480 <br />Total Annual Cost $38,520 <br />Annual O&M Cost During Corrective Action Period $1,155,600 <br />TOTAL COST OVER CORRECTIVE ACTION PERIOD $1,677,090 <br />ANNUAL COST $55,903 <br />Note: inflation factor supplied by CIW MB <br />Corrective Action Financial Assurance Cost Estimate 5 September 30, 2008 <br />Foothill Sanitary Landfill Public Works/Solid Waste Div. <br />
The URL can be used to link to this page
Your browser does not support the video tag.