My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2007-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:07:13 AM
Creation date
1/4/2022 2:21:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2007-2009
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />3. The wells will be operated in a manner to reduce the amount of landfill gas <br />escaping from the bottom of the landfill. <br />4. COST ANALYSIS <br />The cost of the corrective action plan includes engineering design, construction and <br />associated materials, permitting, and the final report. A detailed break down of the <br />associated cost for the project is shown in Table 1. Permitting associated with the project <br />will include RWQCB and SJC well drilling permits. The total project cost was estimated <br />at approximately $216,000. <br />Table 1 Corrective Action Cost Estimate. <br />3 -Inch HDPE Pipe <br />650 <br />LF <br />$6.25 <br />6 -inch HDPE Pipe <br />950 <br />LF <br />$10.25 <br />6 -Inch HDPE Header Valve <br />1 <br />each <br />$1,000.00 <br />Vertical LFG Well <br />800 <br />LF <br />$200.00 <br />LFG Wellhead <br />4 <br />each <br />$723.25 <br />Connection to Existing 12 -Inch Header <br />1 <br />each <br />$2,000.00 <br />Extraction Well Connection to 3 -inch HDPE Pip <br />4 <br />each <br />$2,000.00 <br />Connection of 3 -inch Pipe to 6 -inch Lateral <br />4 <br />each <br />$2,000.00 <br />$9,738 <br />$1,000 <br />$-160,000 <br />$2,893 <br />$2,000 <br />$8,000 <br />$8,000 <br />Total Cost of LFG Extraction System $195,693 <br />RWQCB $4,000 <br />Well Drilling Permit Fee $550 <br />Inspections $500 <br />Total Cost of Permits/Inspections $5,050 <br />Professional and Technical Services <br />Final Report <br />$10,000 <br />$5,000 <br />Total Cost of Engineering Design $15,000 <br />Total Project Cost <br />73467 5 August 9, 2006 <br />LA 31109 Corrective Action Financial Assurance Cost Estimate <br />Foothill Sanitary Landfill <br />$215,743 <br />
The URL can be used to link to this page
Your browser does not support the video tag.