Laserfiche WebLink
0 <br />3. The wells will be operated in a manner to reduce the amount of landfill gas <br />escaping from the bottom of the landfill. <br />4. COST ANALYSIS <br />The cost of the corrective action plan includes engineering design, construction and <br />associated materials, permitting, and the final report. A detailed break down of the <br />associated cost for the project is shown in Table 1. Permitting associated with the project <br />will include RWQCB and SJC well drilling permits. The total project cost was estimated <br />at approximately $216,000. <br />Table 1 Corrective Action Cost Estimate. <br />3 -Inch HDPE Pipe <br />650 <br />LF <br />$6.25 <br />6 -inch HDPE Pipe <br />950 <br />LF <br />$10.25 <br />6 -Inch HDPE Header Valve <br />1 <br />each <br />$1,000.00 <br />Vertical LFG Well <br />800 <br />LF <br />$200.00 <br />LFG Wellhead <br />4 <br />each <br />$723.25 <br />Connection to Existing 12 -Inch Header <br />1 <br />each <br />$2,000.00 <br />Extraction Well Connection to 3 -inch HDPE Pip <br />4 <br />each <br />$2,000.00 <br />Connection of 3 -inch Pipe to 6 -inch Lateral <br />4 <br />each <br />$2,000.00 <br />$9,738 <br />$1,000 <br />$-160,000 <br />$2,893 <br />$2,000 <br />$8,000 <br />$8,000 <br />Total Cost of LFG Extraction System $195,693 <br />RWQCB $4,000 <br />Well Drilling Permit Fee $550 <br />Inspections $500 <br />Total Cost of Permits/Inspections $5,050 <br />Professional and Technical Services <br />Final Report <br />$10,000 <br />$5,000 <br />Total Cost of Engineering Design $15,000 <br />Total Project Cost <br />73467 5 August 9, 2006 <br />LA 31109 Corrective Action Financial Assurance Cost Estimate <br />Foothill Sanitary Landfill <br />$215,743 <br />