My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2010-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2010-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:05:58 AM
Creation date
1/4/2022 2:26:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2010-2013
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Unit Requirements for N-4070-1-4 (continued) Page 2 of 3 <br /> 11. "Malfunction" means any suddet requent, and not reasonably preventable e of air pollution control <br /> equipment, process equipment, or a process to operate in a normal or usual manner. Failures that are caused in part by <br /> poor maintenance or careless operation are not failures. [40 CFR 60.2] Federally Enforceable Through Title V Permit <br /> 12. "Maintenance" is defined as work performed on the collection and/or control system in order to ensure continued <br /> compliance with all applicable Rules and Regulations, and also to prevent failures and malfunctions. The <br /> owner/operator shall minimize emissions during maintenance periods. [District Rule 22011 Federally Enforceable <br /> Through Title V Permit <br /> 13. In the event that the collection or control system becomes inoperable, the gas mover equipment(as defined in 40 CFR <br /> 60.751) shall be shut down and all valves in the collection and control system contributing to venting of the landfill gas <br /> to the atmosphere shall be closed within one hour. [40 CFR 753(e)] Federally Enforceable Through Title V Permit <br /> 14. The collection system shall be operated such that the methane concentration is less than 500 parts per million above <br /> background at the surface of the landfill. Compliance with this surface methane operational standard shall be <br /> demonstrated using the procedures outlined in 40 CFR 60.755(c) within 180 days of installation and startup of the <br /> collection and control system and quarterly thereafter. [40 CFR 60.753(d), 40 CFR 60.755(c), and 40 CFR 60.8] <br /> Federally Enforceable Through Title V Permit <br /> 15. The owner/operator shall install, calibrate, maintain, and operate a meter that measures and records the landfill gas <br /> flow rate into the flare at least once every 15 minutes. This meter shall also be capable of measuring the landfill gas <br /> flow rate that might bypass the flare in the event of equipment malfunction or maintenance. [40 CFR 60.756(c)(2)] <br /> 16. The flare's tip velocity shall be less than 18.3 m/sec (60 ft/sec), as determined by 40 CFR 60.18(f)(4). The net heating <br /> value of the landfill gas being combusted shall not be less than 200 Btu/scf, as determined by 40 CFR 60.18(f)(3). The <br /> flare's tip velocity and the net heating value of the landfill gas shall be determined N�ithin 180 days of installation and <br /> startup of the collection and control system and annually thereafter. [40 CFR 60.18(c)(4)(1) and 40 CFR 60.8] <br /> Federally Enforceable Through Title V Permit <br /> 17. The flare's discharge height shall be at least 30 feet above grade. [District Rules 2201 and 41021 <br /> 18. There shall be no visible emissions from the flare except for periods not exceeding a total of five minutes during any <br /> consecutive two hours. Visible emissions shall be determined using EPA Method 22 and a two-hour observation <br /> period. [40 CFR 60.18(c)(1)] Federally Enforceable Through Title V Permit <br /> 19. The flare shall be operated with a flame present at all times while gas is being vented to it. The presence of a flame <br /> shall be continuously monitored using a thermocouple, ultraviolet sensor, or any other equivalent device located at the <br /> pilot light or the flame itself. The flame's presence shall be recorded at least once every 15 minutes. [40 CFR <br /> 60.18(c)(2) and 40 CFR 60.756(c)(1)] Federally Enforceable Through Title V Permit <br /> 20. The flare shall be operated at all times when landfill gas is vented to it. [40 CFR 60.18(e)] Federally Enforceable <br /> Through Title V Permit <br /> 21. The landfill gas collection and control system shall comply with the operational standards of 40 CFR 60.753, the <br /> compliance provisions of 40 CFR 60.755, the monitoring provisions of 40 CFR 60.756, the reporting and record <br /> keeping requirements of 40 CFR 60.757 and 60.758, and the requirements of 40 CFR 60.759 (for active collection <br /> systems). [40 CFR 60.752(b)(2)(10, 60.753, 60.755, 60.756, 60.757, 60.758, 60.759, 62.14353 and 62.14354(b)] <br /> Federally Enforceable Through Title V Permit <br /> 22. Soil with VOC content of 50 ppm by weight or greater shall not be used as daily cover. [District Rule 4651] Federally <br /> Enforceable Through Title V Permit <br /> 23. The owner or operator shall comply with the requirements of 40 CFR 63.1960 through 63.1985, and with the general <br /> provisions of 40 CFR part 63, as specified in table 1 of 40 CFR part 63, subpart AAAA. [40 CFR 63.1955(6) and <br /> 63.1980(b)] Federally Enforceable Through Title V Permit <br /> 24. The owner or operator shall develop and implement a written startup, shutdown and malfunction (SSM) plan according <br /> to the provisions of 40 CFR 63.6(e)(3). A copy of the SSM plan shall be maintained on site. Failure to write, <br /> implement or maintain a copy of the SSM plan is a deviation from the requirements of 40 CFR part 63, subpart <br /> AAAA. [40 CFR 63.19601 Federally Enforceable Through Title V Permit <br /> PERMIT UNIT REQUIREMENTS CONTINUE ON NEXT PAGE <br /> These terms and conditions are part of the Facility-wide Permit to Operate. <br /> Facility Name FOOTHILL SANITARY LANDFILL <br /> Location 6484 N WAVERLY RD,LINDEN,CA <br /> N-4070-1-4 App 192ol± 62', D,_RISR <br />
The URL can be used to link to this page
Your browser does not support the video tag.