Laserfiche WebLink
Third Quarter 2012 <br /> Table 2. LFG Structure Monitoring Results <br /> Foothill Landfill <br /> Carbon Balance <br /> Methane Dioxide Oxygen Gas <br /> Name Date (%by vol) (%by vol) (%by vol) (%by vol) Comments <br /> Maint.131k.Elec.Conduit 07/10/2012 0.0 0.0 19.0 81.0 <br /> Maint.Bldg.Interior 07/10/2012 0.0 0.0 19.1 80.9 <br /> Managers Residence Elec. 07/10/2012 0.0 0.0 19.3 80.7 <br /> Managers Residence Interior 07/10/2012 0.0 0.0 18.8 81.2 <br /> Managers Residence Crawl Space 07/10/2012 0.0 0.0 19.3 80.7 - <br /> Scalehouse Elec.Conduit 07/10/2012 0.0 0.0 18.2 81.8 - <br /> Scalehouse Interior 07/10/2012 0.0 0.0 18.0 82.0 - <br /> South Residence Elec. 07/10/2012 0.0 0.1 18.6 81.3 - <br /> South Residence Crawl 07/10/2012 0.0 0.0 18.7 1 81.3 - <br /> \\PWSRVFP01\Maint-Ops$\OSolidWaste\Engineering\1 FoothillIM Migrat Monit\2012\3Qtr\ <br /> FH Third Qtr 2012 Structures.xlsx <br />