Laserfiche WebLink
E <br />Foothill Sanitary Landfill, Inc <br />Winterization Plan For 2012-13 <br />E <br />"MOR III 11111111111�11r,I 111�11111111111 III 11�11111111111 11�11111 'I �� 111 9 <br />native sand and gravel. It is sloped so the water flows to the Northwest comer of module <br />to the perimeter ditch. <br />qt a -Fd Southeast comers to carry the run <br />off down the slopes. <br />Berms have been built at the East, West and South of pads to prevent water from flowing <br />11111piq <br />Rlflum= <br />