Laserfiche WebLink
Part 3.FACILITY INFORMATION <br /> A.PROPOSED CHANGE(Check applicable box(es)): <br /> �1.DESIGN(describe): <br /> 2.OPERATION(describe): Revised JTD includes:1)Revised closure and postclosure maintenance plan and costs. 2)Description including reporting <br /> and monitoring requirements about the new landfill gas collection system and perimeter LFG migration monitoring wells. <br /> O3.OWNER,OPERATOR,ADDRESS,AND/OR FACILITY NAME CHANGE(describe): <br /> �4.OTHER(describe): <br /> B.FACILITY INFORMATION: <br /> 1.INFORMATION APPLICABLE TO ALL FACILITIES: <br /> a. PEAK DAILY TONNAGE OR CUBIC YARDS 1500(permitted) <br /> 1) DISPOSAUTRANSFER(unit) Disposal <br /> 2)OTHER(unit) <br /> b. DAILY DESIGN TONNAGE(TPD) 1500 <br /> C. FACILITY SIZE(acres) 800 <br /> d. PEAK TRAFFIC VOLUME PER DAY(vpd) 200 incoming refuse vehicles(permitted) <br /> e. DAYS AND HOURS OF OPERATION(receipt of refuse) Seven days per week,7:00 AM to 5:00 PM. Closed on posted holidays <br /> 2.ADDITIONAL INFO.REQUIRED FOR COMPOSTING FACILITIES ONLY: <br /> a. SITE STORAGE CAPACITY(cu yds) N/A(no composting on site) <br /> 3.ADDITIONAL INFORMATION REQUIRED FOR LANDFILLS ONLY: <br /> a. AVERAGE DAILY TONNAGE(TPD) 613.1 Tons per day(2009) 361 days per year <br /> b. SITE CAPACITY CURRENTLY PERMITTED(Airspace)(cu yds) 0 million CY gross volume(includes ops layer,refuse,daily cover,and closure cap) <br /> Previous estimate was 109 Million. Difference due to more accurate estimate:no change in permit limits are proposed <br /> C. SITE CAPACITY PROPOSED(Airspace)(cu yds) No Change <br /> d. SITE CAPACITY USED TO DATE(Airspace)(cu yds) 0 million CY gross volume(includes ops layer,refuse,daily cover,and closure cap) <br /> e. SITE CAPACITY REMAINING(Airspace)(cu yds) 0 million CY gross volume(includes ops layer,refuse,daily cover,and closure cap) <br /> f. DATE OF CAPACITY INFORMATION(Date)(See instructions). June 10,2010 <br /> g. LAST PHYSICAL SITE SURVEY(Date) June 10,2010 <br /> h. ESTIMATED CLOSURE DATE(month and year) December 2082 <br /> i. DISPOSAL FOOTPRINT(acres) 674 <br /> I. SITE CAPACITY PLANNED(cu yds) 0 Million CY total net capacity(excludes ops layer,refuse,daily cover,and closure cap) <br /> k. 1. (i) IN-PLACE WASTE DENSITY(Ibs of waste per cu yd of waste) 1000 approx-density varies year-to-year. <br /> AND Density between March 12,2009 and June 10,2010 was 1181 Ib/CY <br /> (it)WASTE-TO-COVER RATIO(Estimated)(v:v) 4:1 <br /> OR <br /> 2. AIRSPACE UTILIZATION FACTOR(tons of waste per cu yd of landfill airspace) 0.59 Ib/CY(Density of refuse placed March 12,2009 to June 10,2010) <br /> Part 4.SOURCE OF WATER SUPPLY(Check applicable boxes) <br /> A.MUNICIPAL OR UTILITY SERVICE: <br /> B.INDIVIDUAL(wells): one <br /> OC.SURFACE SUPPLY: <br /> 1.NAME OF STREAM,LAKE,ETC.: pond On site <br /> 2.TYPE OF WATER RIGHTS: <br /> RIPARIAN APPROPRIATION <br /> 3.STATE PERMIT OR LICENSE NUMBER,IF APPLICABLE: <br /> N:\1 Foothill\JTD-Permit Review 2010\ <br /> FH-5 yr_Permit Review App n Tables.xls 2 of 4 <br />