Laserfiche WebLink
0 6 <br /> Foothill Sanitary Landfill Inc. <br /> Winterization Plan 2010-11 Season <br /> Module I has been closed and monitored,no repairs are needed at this time. Monitoring <br /> will continue during the wet season and repairs will be made if necessary. <br /> Module I <br /> Winter pad# I has been constructed with native rock and sand and it's located at <br /> Northeast comer of module, see attached map. <br /> Winter pad#2 is under construction and will continue to be expanded,(weather <br /> permitting) and with the same materials as pad# I <br /> Downcomers have been installed at Southwest and Southeast comer of module. <br /> Berms are constructed to direct water flow to these locations. Some water flows <br /> may change as fill sequence continues <br />