Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer 0 Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum 0 Hydrostatic <br /> Test Equipment Used:Incon STS Sump Test System <br /> Sump/UDC ID T-1 W.O. Near Rack T-2 W.O. Near Gate T-3 Anti Freeze T-4 Gear Oil <br /> Sump Manufacturer Owens Corning Owens Corning Owens Corning Owens Corning <br /> Sump Depth (inches) 44 114 68 68 <br /> Sump Bottom to Top of 18 9 28 28 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 5:30 PM 4:39 PM 12:32 PM 1:30 PM <br /> Initial Reading 3.6248" 2.7806" 2.5060" 0.9910" <br /> Test End Time 5:45 PM 4:39 PM 12:47 PM 1:45 PM <br /> Final Reading 3.6239" 2.7794" 2.1557' 0.9181" <br /> Change in Reading -0.0009" -0.0012 -0.3503" -0.0729" <br /> Pass/Fail Criteria +0.004/-0.002 +0.004/-0.002 +0.004/-0.002 +0.004/-0.002 <br /> Tightness Test Results 0 Pass ❑ Fail 0 Pass ❑ Fail ❑ Pass 0 Fail ❑ Pass 0 Fail <br /> Sump/UDC ID T-5 Motor Oil T-6 W.O.Tank Field T-7 Soap Tank <br /> Sump Manufacturer Owens Corning Owens Corning Owens Corning <br /> Sump Depth (inches) 68 75 49 <br /> Sump Bottom to Top of 29 19 21 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 2:30 PM 12:32 PM 9:27 AM <br /> Initial Reading 1.4723" 2.4079" 4.6580" <br /> Test End Time 2:45 PM 12:47 PM 9:42 AM <br /> Final Reading 1.4632" 2.4075" 4.6576" <br /> Change in Reading -0.00911, -0.0004" -0.0004" <br /> Pass/Fail Criteria +0.004/-0.002 +0.004/-0.002 +0.004/-0.002 <br /> Tightness Test Results ❑ Pass 0 Fail 0 Pass ❑ Fail 0 Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />